DESIGN DEVELOPMENT [2 records]
Record 1 - internal organization data 2001-03-23
Record 1, English
Record 1, Subject field(s)
- Quality Control (Management)
Record 1, Main entry term, English
- design and development
1, record 1, English, design%20and%20development
correct, standardized
Record 1, Abbreviations, English
Record 1, Synonyms, English
Record 1, Textual support, English
Record number: 1, Textual support number: 1 DEF
Set of processes that transforms requirements into specified characteristics or into the specification of a product, process or system. 1, record 1, English, - design%20and%20development
Record number: 1, Textual support number: 1 OBS
Term and definition standardized by ISO in 2000. 2, record 1, English, - design%20and%20development
Record 1, French
Record 1, Domaine(s)
- Contrôle de la qualité (Gestion)
Record 1, Main entry term, French
- conception et développement
1, record 1, French, conception%20et%20d%C3%A9veloppement
correct, standardized
Record 1, Abbreviations, French
Record 1, Synonyms, French
Record 1, Textual support, French
Record number: 1, Textual support number: 1 DEF
Ensemble de processus qui transforme des exigences en caractéristiques spécifiées ou en spécification d'un produit, d'un processus ou d'un système. 1, record 1, French, - conception%20et%20d%C3%A9veloppement
Record number: 1, Textual support number: 1 OBS
Terme et définition normalisés par l'ISO en 2000. 1, record 1, French, - conception%20et%20d%C3%A9veloppement
Record 1, Spanish
Record 1, Textual support, Spanish
Record 2 - internal organization data 2001-01-15
Record 2, English
Record 2, Subject field(s)
- Various Proper Names
- Management Operations (General)
Record 2, Main entry term, English
- Design Development 1, record 2, English, Design%20Development
Record 2, Abbreviations, English
Record 2, Synonyms, English
Record 2, Textual support, English
Record number: 2, Textual support number: 1 OBS
Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications. 2, record 2, English, - Design%20Development
Record number: 2, Textual support number: 2 OBS
The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team. 2, record 2, English, - Design%20Development
Record 2, French
Record 2, Domaine(s)
- Appellations diverses
- Opérations de la gestion (Généralités)
Record 2, Main entry term, French
- Avant-projet
1, record 2, French, Avant%2Dprojet
masculine noun
Record 2, Abbreviations, French
Record 2, Synonyms, French
Record 2, Textual support, French
Record number: 2, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L'objectif de cette sous-phase consiste à s'assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d'autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s'assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d'améliorer la clarté des dessins et (ou) des devis. 2, record 2, French, - Avant%2Dprojet
Record number: 2, Textual support number: 2 OBS
Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d'un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d'avancement du projet et d'attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d'investissement ou de réalisation d'un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire. 2, record 2, French, - Avant%2Dprojet
Record 2, Spanish
Record 2, Textual support, Spanish
Copyright notice for the TERMIUM Plus® data bank
© Public Services and Procurement Canada, 2024
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau
Features
Language Portal of Canada
Access a collection of Canadian resources on all aspects of English and French, including quizzes.
Writing tools
The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.
Glossaries and vocabularies
Access Translation Bureau glossaries and vocabularies.
- Date Modified: