TERMIUM Plus®

La banque de données terminologiques et linguistiques du gouvernement du Canada.

FORAGE ALIGNEMENT [1 fiche]

Fiche 1 1988-09-15

Anglais

Subject field(s)
  • Blasting Work (Mining)
DEF

Line drilling: In this method regular rockdrill holes, about 11/2 inches in diameter, are spaced 4 to 6 inches apart along the perimeter and left uncharged. Larger diameter holes could be placed at greater spacing intervals. The buffer zone between the perimeter holes and the last row of main round holes should be about 8 to 12 inches wide (the buffer distance). The drilled unloaded holes along the periphery alone provide a plane of weakness to which the rock will break readily and cleanly when the round is fired.

Français

Domaine(s)
  • Travail aux explosifs (Exploitation minière)

Espagnol

Conserver la fiche 1

Avis de droit d’auteur pour la banque de données TERMIUM Plus®

© Services publics et Approvisionnement Canada, 2024
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction

En vedette

Portail linguistique du Canada

Accédez à une collection de ressources canadiennes sur tous les aspects du français et de l'anglais, y compris des jeux.

Outils d'aide à la rédaction

Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.

Lexiques et vocabulaires

Accédez aux lexiques et vocabulaires du Bureau de la traduction.

Date de modification :