TERMIUM Plus®

La banque de données terminologiques et linguistiques du gouvernement du Canada.

INSTALLATION ESSAI NIVEAU BATIS [1 fiche]

Fiche 1 2003-10-22

Anglais

Subject field(s)
  • Orbital Stations
CONT

The Rack Level Test Facility is the formal verification tool used for the functional and operational testing of internal payloads. The Rack Level Test Facility will however, be modified to also allow the verification of external payloads and centre-aisle payloads, but this capability does not currently exist. This verification is carried out before installation into the Columbus Laboratory (for the initial internal payload complement), or prior to shipment to the Kennedy Space Centre for installation into the Multi Purpose Logistics Module, for transportation to the ISS.

OBS

rack level test facility; RLTF: term and abbreviation officially approved by the International Space Station official approval Group (ISSOAG).

Français

Domaine(s)
  • Stations orbitales
OBS

système d'essai niveau bâtis; RLTF : terme et abréviation uniformisés par le Groupe de travail de la terminologie de la Station spatiale internationale (GTTSSI).

Espagnol

Conserver la fiche 1

Avis de droit d’auteur pour la banque de données TERMIUM Plus®

© Services publics et Approvisionnement Canada, 2024
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction

En vedette

Portail linguistique du Canada

Accédez à une collection de ressources canadiennes sur tous les aspects du français et de l'anglais, y compris des jeux.

Outils d'aide à la rédaction

Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.

Lexiques et vocabulaires

Accédez aux lexiques et vocabulaires du Bureau de la traduction.

Date de modification :