TERMIUM Plus®
La banque de données terminologiques et linguistiques du gouvernement du Canada.
CONCEPTUAL DESIGN REPORT [4 fiches]
Fiche 1 - données d’organisme interne 2011-06-09
Fiche 1, Anglais
Fiche 1, Subject field(s)
- Titles of Reports
- Waste Management
- Nuclear Waste Materials
Universal entry(ies) Fiche 1
Fiche 1, La vedette principale, Anglais
- Review of Liner and Cover Design and Construction Plans. The Port Hope Long-term Low-level Radioactive Waste Management Project Preliminary Engineering Design Report
1, fiche 1, Anglais, Review%20of%20Liner%20and%20Cover%20Design%20and%20Construction%20Plans%2E%20The%20Port%20Hope%20Long%2Dterm%20Low%2Dlevel%20Radioactive%20Waste%20Management%20Project%20Preliminary%20Engineering%20Design%20Report
correct
Fiche 1, Les abréviations, Anglais
Fiche 1, Les synonymes, Anglais
Fiche 1, Justifications, Anglais
Record number: 1, Textual support number: 1 CONT
RSP-0219 Review of Liner and Cover Design and Construction Plans; The Port Hope Long-term Low-level Radioactive Waste Management Project Preliminary Engineering Design Report Volume 1. Design and Operations Plan LLRWMO-1340-PDD-12001, Revision 0, R. Kerry Rowe Inc. The conceptual design for the cover and liner proposed for the Port Hope Project Long Term Waste Management Facility, as detailed in the Preliminary Engineering Design Report [Volume 1, LLRWMO-1340-PDD-12001, Revision 0, July 2006](the Report) is considered to be generally sound. Provided the issues raised in this review are addressed and provided that the detailed design, specifications and construction drawings are subjected to a thorough peer review to confirm that the issues raised herein have been addressed, it is considered likely that the “less than 1mm/a seepage rate” out of the landfill assumed in the Environmental Assessment Study Report will be achieved over the 500 year period being considered. 2, fiche 1, Anglais, - Review%20of%20Liner%20and%20Cover%20Design%20and%20Construction%20Plans%2E%20The%20Port%20Hope%20Long%2Dterm%20Low%2Dlevel%20Radioactive%20Waste%20Management%20Project%20Preliminary%20Engineering%20Design%20Report
Fiche 1, Français
Fiche 1, Domaine(s)
- Titres de rapports
- Gestion des déchets
- Déchets nucléaires
Entrée(s) universelle(s) Fiche 1
Fiche 1, La vedette principale, Français
- Review of Liner and Cover Design and Construction Plans. The Port Hope Long-term Low-level Radioactive Waste Management Project Preliminary Engineering Design Report
1, fiche 1, Français, Review%20of%20Liner%20and%20Cover%20Design%20and%20Construction%20Plans%2E%20The%20Port%20Hope%20Long%2Dterm%20Low%2Dlevel%20Radioactive%20Waste%20Management%20Project%20Preliminary%20Engineering%20Design%20Report
correct, voir observation
Fiche 1, Les abréviations, Français
Fiche 1, Les synonymes, Français
- Examen de la conception du revêtement et de la couche de couverture et des plans de construction. Rapport sur la conception technique préliminaire du Projet de gestion à long terme des déchets radioactifs de faible activité de Port Hope 2, fiche 1, Français, Examen%20de%20la%20conception%20du%20rev%C3%AAtement%20et%20de%20la%20couche%20de%20couverture%20et%20des%20plans%20de%20construction%2E%20Rapport%20sur%20la%20conception%20technique%20pr%C3%A9liminaire%20du%20Projet%20de%20gestion%20%C3%A0%20long%20terme%20des%20d%C3%A9chets%20radioactifs%20de%20faible%20activit%C3%A9%20de%20Port%20Hope
non officiel
Fiche 1, Justifications, Français
Record number: 1, Textual support number: 1 OBS
RSP-0219 : Numéro du rapport. Selon le document intitulé «Résumés des rapports de recherche produits au cours de l'année financière 2006-2007», que l'on trouve dans le site Internet de la Commission canadienne de sûreté nucléaire, ce rapport a été soumis et est disponible en anglais seulement. Le synonyme français donné sur cette fiche est une traduction non officielle donnée uniquement à titre d'information. 3, fiche 1, Français, - Review%20of%20Liner%20and%20Cover%20Design%20and%20Construction%20Plans%2E%20The%20Port%20Hope%20Long%2Dterm%20Low%2Dlevel%20Radioactive%20Waste%20Management%20Project%20Preliminary%20Engineering%20Design%20Report
Record number: 1, Textual support number: 2 OBS
[Description du sujet du rapport :] La conception de la couche de couverture et du revêtement proposés pour l’installation de gestion [à long terme] des déchets radioactifs [...] de Port Hope, tel qu’indiqué dans le rapport de conception technique préliminaire ((Volume 1, LLRWMO-1340-PDD-12001, Révision 0, juillet 2006)). (Le Rapport) est considéré comme étant fiable dans l’ensemble. Si les questions soulevées dans cet examen sont traitées et si la conception, les spécifications et les schémas de construction détaillés sont assujettis à un examen par les pairs en vue de confirmer que les questions soulevées dans le document sont traitées efficacement, il est probable que le «taux de suintement inférieur à 1 mm/année» de la décharge précisé dans le Rapport d’étude d’évaluation environnementale sera respecté au cours de la période de 500 ans envisagée. 1, fiche 1, Français, - Review%20of%20Liner%20and%20Cover%20Design%20and%20Construction%20Plans%2E%20The%20Port%20Hope%20Long%2Dterm%20Low%2Dlevel%20Radioactive%20Waste%20Management%20Project%20Preliminary%20Engineering%20Design%20Report
Fiche 1, Espagnol
Fiche 1, Justifications, Espagnol
Fiche 2 - données d’organisme externe 2007-11-08
Fiche 2, Anglais
Fiche 2, Subject field(s)
- Waste Management
- Nuclear Waste Materials
- Compartment - Canadian Nuclear Safety Commission
Fiche 2, La vedette principale, Anglais
- Port Hope project long term waste management facility 1, fiche 2, Anglais, Port%20Hope%20project%20long%20term%20waste%20management%20facility
Fiche 2, Les abréviations, Anglais
Fiche 2, Les synonymes, Anglais
Fiche 2, Justifications, Anglais
Record number: 2, Textual support number: 1 CONT
The conceptual design for the cover and liner proposed for the Port Hope Project Long Term Waste Management Facility, as detailed in the Preliminary Engineering Design Report [Volume 1, LLRWMO-1340-PDD-12001, Revision 0, July 2006](the Report) is considered to be generally sound. 1, fiche 2, Anglais, - Port%20Hope%20project%20long%20term%20waste%20management%20facility
Fiche 2, Français
Fiche 2, Domaine(s)
- Gestion des déchets
- Déchets nucléaires
- Tiroir - Commission canadienne de sûreté nucléaire
Fiche 2, La vedette principale, Français
- installation de gestion des déchets radioactifs à long terme de Port Hope
1, fiche 2, Français, installation%20de%20gestion%20des%20d%C3%A9chets%20radioactifs%20%C3%A0%20long%20terme%20de%20Port%20Hope
nom féminin
Fiche 2, Les abréviations, Français
Fiche 2, Les synonymes, Français
Fiche 2, Justifications, Français
Record number: 2, Textual support number: 1 CONT
La conception de la couche de couverture et du revêtement proposés pour l'installation de gestion des déchets radioactifs à long terme de Port Hope, tel qu'indiqué dans le rapport de conception technique préliminaire [Volume 1, LLRWMO-1340-PDD-12001, Révision 0, juillet 2006] (le Rapport) est considéré comme étant fiable dans l'ensemble. 1, fiche 2, Français, - installation%20de%20gestion%20des%20d%C3%A9chets%20radioactifs%20%C3%A0%20long%20terme%20de%20Port%20Hope
Fiche 2, Espagnol
Fiche 2, Justifications, Espagnol
Fiche 3 - données d’organisme externe 2007-11-08
Fiche 3, Anglais
Fiche 3, Subject field(s)
- Business and Administrative Documents
- Industrial Design
- Compartment - Canadian Nuclear Safety Commission
Fiche 3, La vedette principale, Anglais
- preliminary engineering design report 1, fiche 3, Anglais, preliminary%20engineering%20design%20report
Fiche 3, Les abréviations, Anglais
Fiche 3, Les synonymes, Anglais
Fiche 3, Justifications, Anglais
Record number: 3, Textual support number: 1 CONT
The conceptual design for the cover and liner proposed for the Port Hope Project Long Term Waste Management Facility, as detailed in the Preliminary Engineering Design Report [Volume 1, LLRWMO-1340-PDD-12001, Revision 0, July 2006](the Report) is considered to be generally sound. 1, fiche 3, Anglais, - preliminary%20engineering%20design%20report
Fiche 3, Français
Fiche 3, Domaine(s)
- Écrits commerciaux et administratifs
- Dessin industriel
- Tiroir - Commission canadienne de sûreté nucléaire
Fiche 3, La vedette principale, Français
- rapport de conception technique préliminaire
1, fiche 3, Français, rapport%20de%20conception%20technique%20pr%C3%A9liminaire
nom masculin
Fiche 3, Les abréviations, Français
Fiche 3, Les synonymes, Français
Fiche 3, Justifications, Français
Record number: 3, Textual support number: 1 CONT
La conception de la couche de couverture et du revêtement proposés pour l'installation de gestion des déchets radioactifs à long terme de Port Hope, tel qu'indiqué dans le rapport de conception technique préliminaire [Volume 1, LLRWMO-1340-PDD-12001, Révision 0, juillet 2006] (le Rapport) est considéré comme étant fiable dans l'ensemble. 1, fiche 3, Français, - rapport%20de%20conception%20technique%20pr%C3%A9liminaire
Fiche 3, Espagnol
Fiche 3, Justifications, Espagnol
Fiche 4 - données d’organisme interne 1999-05-14
Fiche 4, Anglais
Fiche 4, Subject field(s)
- Titles of Reports
- Business and Administrative Documents
Fiche 4, La vedette principale, Anglais
- Conceptual Design Report 1, fiche 4, Anglais, Conceptual%20Design%20Report
Fiche 4, Les abréviations, Anglais
Fiche 4, Les synonymes, Anglais
Fiche 4, Justifications, Anglais
Record number: 4, Textual support number: 1 OBS
Project Management Practice Standard-Section 3. 3. 5-Concept Design : in some instances, where projects are small or consist of engineered works(where preliminary studies have already been done), this sub-phase may be combined with 3. 3. 6 Design Development. However, where the project is large, complex or unique the Project Team may decide that it is more efficient and economical to discuss the merits of various design options, while the design is still in conceptual form. In the latter case, the objective of this sub-phase is to conceptually define the design concept and the class C cost estimate, and then to gain client and RPS approval prior to instructing the designers to develop a more refined design. Although the consultant and client may communicate directly, the Project Manager must manage the communication flow to control project commitments and to ensure that there is full understanding by both parties. This involves helping the client to analyze and to evaluate the consultant's enquiries, and then responding to the consultant in technical terms which satisfy specific design conditions. Once the consultant has fulfilled the requirement for submissions as specified in the Project Brief, and the client, the project team, the regulatory authorities and the RPS design authorities have accepted the final concept, the Project Manager ensures adequate documentation of these positions in a Conceptual Design Report. This report is formally signed off by all Project Team members. Thus, this sub-phase is completed when the Project Manager is convinced that the consultant has adequately addressed the needs of the client/owner within acceptable time, cost and quality parameters. Only then will the Project Manager allow the consultant to refine the concept in the Design Development phase. 2, fiche 4, Anglais, - Conceptual%20Design%20Report
Fiche 4, Français
Fiche 4, Domaine(s)
- Titres de rapports
- Écrits commerciaux et administratifs
Fiche 4, La vedette principale, Français
- Rapport de définition du concept
1, fiche 4, Français, Rapport%20de%20d%C3%A9finition%20du%20concept
nom masculin
Fiche 4, Les abréviations, Français
Fiche 4, Les synonymes, Français
Fiche 4, Justifications, Français
Record number: 4, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section - 3.3.5 Conception : Dans certains cas, lorsque les projets sont relativement peu importants et prévoient des ouvrages de génie (et que les premières études sont déjà faites), on peut regrouper cette sous-phase et la sous-phase 3.3.6 (Avant-projet). Toutefois, lorsqu'il s'agit d'un projet important, complexe ou exceptionnel, l'équipe chargée du projet peut décider qu'il sera plus efficace et plus économique de discuter du bien-fondé de diverses options de conception à l'étape de l'avant-projet. Dans ce dernier cas, l'objectif de cette sous-phase consiste à définir théoriquement le concept du design et à établir l'estimation des coûts du type C, puis à demander l'approbation du client et des SI avant de donner pour consigne aux responsables de la conception d'élaborer un projet plus complet. Bien que l'expert-conseil et le client puissent communiquer directement entre eux, le gestionnaire de projet doit encadrer les échanges afin de contrôler les engagements financiers consacrés au projet et de veiller à ce que les deux parties soient parfaitement au courant des exigences à respecter. Il s'agit notamment d'aider le client à analyser et à évaluer les demandes de renseignements de l'expert-conseil, puis à y donner suite en faisant appel à des termes techniques qui respectent les conditions particulières de la conception. Lorsque l'expert-conseil a déposé les documents nécessaires conformément aux exigences précisées dans l'Énoncé de projet et que le client, l'équipe chargée du projet, les responsables de la réglementation ainsi que les responsables de la conception des SI ont accepté la conception finale, le gestionnaire de projet veille à consigner comme il se doit cette acceptation dans un Rapport de définition du concept. Tous les membres de l'équipe chargée du projet approuvent officiellement ce rapport. Par conséquent, cette sous-phase prend fin lorsque le gestionnaire de projet est convaincu 2, fiche 4, Français, - Rapport%20de%20d%C3%A9finition%20du%20concept
Fiche 4, Espagnol
Fiche 4, Justifications, Espagnol
Avis de droit d’auteur pour la banque de données TERMIUM Plus®
© Services publics et Approvisionnement Canada, 2025
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction
En vedette
Portail linguistique du Canada

Accédez à une collection de ressources canadiennes sur tous les aspects du français et de l'anglais, y compris des jeux.
Outils d'aide à la rédaction

Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.
Lexiques et vocabulaires

Accédez aux lexiques et vocabulaires du Bureau de la traduction.
- Date de modification :