TERMIUM Plus®
Par le Bureau de la traduction
Dans les médias sociaux
Consultez la banque de données terminologiques du gouvernement du Canada.
ESTIMATION COUTS INVESTISSEMENT [4 fiches]
Fiche 1 - données d’organisme interne 2001-07-12
Fiche 1, Anglais
Fiche 1, Subject field(s)
- Investment
Fiche 1, La vedette principale, Anglais
- capital cost estimate
1, fiche 1, Anglais, capital%20cost%20estimate
correct
Fiche 1, Les abréviations, Anglais
Fiche 1, Les synonymes, Anglais
Fiche 1, Justifications, Anglais
Record number: 1, Textual support number: 1 CONT
The Board, in determining an appropriate rate of return on equity investment in a company, take into account the capital cost estimates set out in agreement... 1, fiche 1, Anglais, - capital%20cost%20estimate
Fiche 1, Français
Fiche 1, Domaine(s)
- Investissements et placements
Fiche 1, La vedette principale, Français
- estimation des coûts d'investissement
1, fiche 1, Français, estimation%20des%20co%C3%BBts%20d%27investissement
nom féminin
Fiche 1, Les abréviations, Français
Fiche 1, Les synonymes, Français
Fiche 1, Justifications, Français
Record number: 1, Textual support number: 1 CONT
En établissant le taux approprié de rentabilité des participations dans une compagnie, l'Office tient compte de l'estimation des coûts d’investissement exposée à l'Accord [...] 1, fiche 1, Français, - estimation%20des%20co%C3%BBts%20d%27investissement
Fiche 1, Espagnol
Fiche 1, Justifications, Espagnol
Fiche 2 - données d’organisme interne 2001-01-15
Fiche 2, Anglais
Fiche 2, Subject field(s)
- Various Proper Names
- Management Operations (General)
Fiche 2, La vedette principale, Anglais
- Design Development 1, fiche 2, Anglais, Design%20Development
Fiche 2, Les abréviations, Anglais
Fiche 2, Les synonymes, Anglais
Fiche 2, Justifications, Anglais
Record number: 2, Textual support number: 1 OBS
Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications. 2, fiche 2, Anglais, - Design%20Development
Record number: 2, Textual support number: 2 OBS
The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team. 2, fiche 2, Anglais, - Design%20Development
Fiche 2, Français
Fiche 2, Domaine(s)
- Appellations diverses
- Opérations de la gestion (Généralités)
Fiche 2, La vedette principale, Français
- Avant-projet
1, fiche 2, Français, Avant%2Dprojet
nom masculin
Fiche 2, Les abréviations, Français
Fiche 2, Les synonymes, Français
Fiche 2, Justifications, Français
Record number: 2, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis. 2, fiche 2, Français, - Avant%2Dprojet
Record number: 2, Textual support number: 2 OBS
Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire. 2, fiche 2, Français, - Avant%2Dprojet
Fiche 2, Espagnol
Fiche 2, Justifications, Espagnol
Fiche 3 - données d’organisme interne 1999-05-14
Fiche 3, Anglais
Fiche 3, Subject field(s)
- Titles of Reports
- Management Operations (General)
Fiche 3, La vedette principale, Anglais
- Preliminary Design Report 1, fiche 3, Anglais, Preliminary%20Design%20Report
Fiche 3, Les abréviations, Anglais
Fiche 3, Les synonymes, Anglais
Fiche 3, Justifications, Anglais
Record number: 3, Textual support number: 1 OBS
Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications. 2, fiche 3, Anglais, - Preliminary%20Design%20Report
Record number: 3, Textual support number: 2 OBS
The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team. 2, fiche 3, Anglais, - Preliminary%20Design%20Report
Fiche 3, Français
Fiche 3, Domaine(s)
- Titres de rapports
- Opérations de la gestion (Généralités)
Fiche 3, La vedette principale, Français
- Rapport de conception préliminaire
1, fiche 3, Français, Rapport%20de%20conception%20pr%C3%A9liminaire
nom masculin
Fiche 3, Les abréviations, Français
Fiche 3, Les synonymes, Français
Fiche 3, Justifications, Français
Record number: 3, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis. 2, fiche 3, Français, - Rapport%20de%20conception%20pr%C3%A9liminaire
Record number: 3, Textual support number: 2 OBS
Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire. 2, fiche 3, Français, - Rapport%20de%20conception%20pr%C3%A9liminaire
Fiche 3, Espagnol
Fiche 3, Justifications, Espagnol
Fiche 4 - données d’organisme interne 1995-12-18
Fiche 4, Anglais
Fiche 4, Subject field(s)
- Organization Planning
- Economic Planning
Fiche 4, La vedette principale, Anglais
- project analysis
1, fiche 4, Anglais, project%20analysis
correct
Fiche 4, Les abréviations, Anglais
Fiche 4, Les synonymes, Anglais
Fiche 4, Justifications, Anglais
Record number: 4, Textual support number: 1 DEF
The quantitative and qualitative analysis and evaluation of the effectiveness, consistency and feasibility of the functions, techniques, processes and activities associated with a project to determine the necessary steps for continuation, improvement, correction or discontinuation. 2, fiche 4, Anglais, - project%20analysis
Fiche 4, Français
Fiche 4, Domaine(s)
- Planification d'organisation
- Planification économique
Fiche 4, La vedette principale, Français
- analyse de projet
1, fiche 4, Français, analyse%20de%20projet
correct, nom féminin
Fiche 4, Les abréviations, Français
Fiche 4, Les synonymes, Français
Fiche 4, Justifications, Français
Record number: 4, Textual support number: 1 OBS
Analyser un projet consiste (...) à comparer des utilisations de ressources et des revenus ou avantages futurs étalés sur une certaine période de temps. 2, fiche 4, Français, - analyse%20de%20projet
Record number: 4, Textual support number: 2 OBS
(...) un projet doit faire l'objet d’un ensemble d’analyses qui doivent porter sur six principaux éléments : les conditions juridiques et fiscales(...) ;les schémas d’organisation prévus; l'estimation des coûts d’investissement et d’exploitation ainsi que des recettes et avantages prévus; la recherche des moyens financiers qui pourront être mobilisés pour la réalisation; enfin, la comparaison entre les coûts et les recettes ou avantages attendus. 2, fiche 4, Français, - analyse%20de%20projet
Fiche 4, Espagnol
Fiche 4, Campo(s) temático(s)
- Planificación de organización
- Planificación económica
Fiche 4, La vedette principale, Espagnol
- análisis de proyectos
1, fiche 4, Espagnol, an%C3%A1lisis%20de%20proyectos
correct, nom masculin
Fiche 4, Les abréviations, Espagnol
Fiche 4, Les synonymes, Espagnol
Fiche 4, Justifications, Espagnol
Record number: 4, Textual support number: 1 DEF
Es un sistema analítico que compara los costos con los beneficios, a fin de determinar si un proyecto propuesto, dadas las opciones, fomentará en grado suficiente el objetivo de la entidad desde cuyo punto de vista está llevándose a cabo el análisis, como para justificar el que se emprenda el proyecto. 2, fiche 4, Espagnol, - an%C3%A1lisis%20de%20proyectos
Fiche 4, Terme(s)-clé(s)
- análisis de proyecto
Avis de droit d’auteur pour la banque de données TERMIUM Plus®
© Services publics et Approvisionnement Canada, 2026
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction
En vedette
GCtraduction (accessible uniquement sur le réseau du gouvernement du Canada)
Utilisez ce prototype d’intelligence artificielle pour traduire le contenu du gouvernement du Canada jusqu’au niveau Protégé B inclusivement. Réservé au personnel de certains ministères et organismes.
Outils d'aide à la rédaction
Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.
Lexiques et vocabulaires
Accédez aux lexiques et vocabulaires du Bureau de la traduction.
- Date de modification :


