ESTIMATION DETAILLEE [12 fiches]
Fiche 1 - données d’organisme interne 2026-01-08
Fiche 1, Anglais
Fiche 1, Subject field(s)
- Plans and Specifications (Construction)
- Foreign Trade
Fiche 1, La vedette principale, Anglais
- quotation
1, fiche 1, Anglais, quotation
correct
Fiche 1, Les abréviations, Anglais
Fiche 1, Les synonymes, Anglais
Fiche 1, Justifications, Anglais
Record number: 1, Textual support number: 1 DEF
Price (bid proposal) quoted by a contractor, material supplier, or vendor to furnish materials or labor, or both. 2, fiche 1, Anglais, - quotation
Fiche 1, Français
Fiche 1, Domaine(s)
- Devis, cahiers des charges et plans (Construction)
- Commerce extérieur
Fiche 1, La vedette principale, Français
- devis
1, fiche 1, Français, devis
correct, nom masculin
Fiche 1, Les abréviations, Français
Fiche 1, Les synonymes, Français
- estimé 2, fiche 1, Français, estim%C3%A9
correct, nom masculin, Canada
Fiche 1, Justifications, Français
Record number: 1, Textual support number: 1 DEF
Description détaillée des pièces, des matériaux et des opérations nécessaires pour réaliser une production, une construction, une installation ou une réparation, avec l'estimation des dépenses.(Larousse) 3, fiche 1, Français, - devis
Record number: 1, Textual support number: 1 OBS
Devis ajoute à cahier des charges l’estimation du prix. 3, fiche 1, Français, - devis
Record number: 1, Textual support number: 2 OBS
La soumission peut se faire à l’aide d’un devis lorsqu’il s’agit d’une construction. 3, fiche 1, Français, - devis
Record number: 1, Textual support number: 3 OBS
estimé : Terme entériné par le Comité de linguistique de Radio-Canada et le Secrétariat d’État du Canada. 4, fiche 1, Français, - devis
Fiche 1, Espagnol
Fiche 1, Campo(s) temático(s)
- Planos y pliegos de condiciones (Construcción)
- Comercio exterior
Fiche 1, La vedette principale, Espagnol
- cotización
1, fiche 1, Espagnol, cotizaci%C3%B3n
correct, nom féminin
Fiche 1, Les abréviations, Espagnol
Fiche 1, Les synonymes, Espagnol
Fiche 1, Justifications, Espagnol
Fiche 2 - données d’organisme interne 2017-02-13
Fiche 2, Anglais
Fiche 2, Subject field(s)
- Plans and Specifications (Construction)
- Estimating (Construction)
- Government Contracts
Fiche 2, La vedette principale, Anglais
- priced bill
1, fiche 2, Anglais, priced%20bill
correct
Fiche 2, Les abréviations, Anglais
Fiche 2, Les synonymes, Anglais
- priced bill of quantities 2, fiche 2, Anglais, priced%20bill%20of%20quantities
correct, normalisé
Fiche 2, Justifications, Anglais
Record number: 2, Textual support number: 1 DEF
A listing of all materials required for a project, with prices and costs added. 3, fiche 2, Anglais, - priced%20bill
Record number: 2, Textual support number: 1 CONT
A Bill of Quantities which has been priced by the contractor (i.e. he has added his rates for each operation and multiplied this by the quantity (extended) to arrive at his total tender) and is used as one of the contract documents to control the work. 4, fiche 2, Anglais, - priced%20bill
Record number: 2, Textual support number: 1 OBS
priced bill of quantities: term standardized by ISO. 5, fiche 2, Anglais, - priced%20bill
Fiche 2, Français
Fiche 2, Domaine(s)
- Devis, cahiers des charges et plans (Construction)
- Évaluation et estimation (Construction)
- Marchés publics
Fiche 2, La vedette principale, Français
- devis quantitatif chiffré
1, fiche 2, Français, devis%20quantitatif%20chiffr%C3%A9
correct, nom masculin, normalisé
Fiche 2, Les abréviations, Français
Fiche 2, Les synonymes, Français
- devis quantitatif-estimatif 2, fiche 2, Français, devis%20quantitatif%2Destimatif
correct, nom masculin
Fiche 2, Justifications, Français
Record number: 2, Textual support number: 1 DEF
Devis quantitatif contenant les prix demandés par l’entrepreneur, appliqués et totalisés pour donner le montant de l’offre. [Définition normalisée par l’ISO.] 3, fiche 2, Français, - devis%20quantitatif%20chiffr%C3%A9
Record number: 2, Textual support number: 1 OBS
Le devis quantitatif donne la liste détaillée, par poste, du nombre d’unités d’œuvre(mètres linéaires ou ml; m²; m³; unités U) qui composent les marchés de chaque corps d’état. Le devis estimatif donne, pour chaque poste et chaque corps d’état, une estimation préalable des prix envisageables, servant de base à la consultation ou à l'appel d’offres [...] Souvent, ces deux [devis] ne forment qu'un seul document, dit quantitatif-estimatif. 2, fiche 2, Français, - devis%20quantitatif%20chiffr%C3%A9
Record number: 2, Textual support number: 2 OBS
devis quantitatif chiffré : terme normalisé par l’ISO. 4, fiche 2, Français, - devis%20quantitatif%20chiffr%C3%A9
Fiche 2, Espagnol
Fiche 2, Campo(s) temático(s)
- Planos y pliegos de condiciones (Construcción)
- Evaluación y estimación (Construcción)
- Contratos gubernamentales
Fiche 2, La vedette principale, Espagnol
- estimación cuantitativa con precios
1, fiche 2, Espagnol, estimaci%C3%B3n%20cuantitativa%20con%20precios
nom féminin
Fiche 2, Les abréviations, Espagnol
Fiche 2, Les synonymes, Espagnol
Fiche 2, Justifications, Espagnol
Fiche 3 - données d’organisme interne 2011-11-21
Fiche 3, Anglais
Fiche 3, Subject field(s)
- Taxation
- Government Accounting
Fiche 3, La vedette principale, Anglais
- substantive cost estimate
1, fiche 3, Anglais, substantive%20cost%20estimate
correct
Fiche 3, Les abréviations, Anglais
Fiche 3, Les synonymes, Anglais
- substantive estimate 2, fiche 3, Anglais, substantive%20estimate
correct
Fiche 3, Justifications, Anglais
Record number: 3, Textual support number: 1 DEF
An estimate of sufficiently high quality and reliability so as to warrant Treasury Board approval as a cost objective for the project phase under consideration. 3, fiche 3, Anglais, - substantive%20cost%20estimate
Record number: 3, Textual support number: 1 CONT
A substantive estimate is one of high quality and reliability and is based on: detailed system and component design, design adaptation, workplans and drawings for components, construction or assembly, and installation. It includes site acquisition, preparation and any special requirements estimates. Contingency funding requirements must be justified based on line-by-line risk assessments, including market factors, industrial capability and labour considerations. 4, fiche 3, Anglais, - substantive%20cost%20estimate
Record number: 3, Textual support number: 1 OBS
[The substantive cost estimate] is based on detailed system and component design and takes into account all project objectives and deliverables. 3, fiche 3, Anglais, - substantive%20cost%20estimate
Fiche 3, Français
Fiche 3, Domaine(s)
- Fiscalité
- Comptabilité publique
Fiche 3, La vedette principale, Français
- estimation de coût fondée
1, fiche 3, Français, estimation%20de%20co%C3%BBt%20fond%C3%A9e
correct, nom féminin
Fiche 3, Les abréviations, Français
Fiche 3, Les synonymes, Français
- estimation fondée 2, fiche 3, Français, estimation%20fond%C3%A9e
correct, nom féminin
Fiche 3, Justifications, Français
Record number: 3, Textual support number: 1 DEF
Estimation suffisamment précise et fiable pour permettre au Conseil du Trésor d’approuver un objectif en ce qui a trait au coût de la phase du projet à l’étude. 3, fiche 3, Français, - estimation%20de%20co%C3%BBt%20fond%C3%A9e
Record number: 3, Textual support number: 1 CONT
La qualité et la fiabilité de l'estimation fondée sont élevées et [cette dernière] repose sur : une conception détaillée du système et de ses composantes, l'adaptation du modèle, les plans de travail et esquisses des composantes, le détail de la construction ou assemblage et de l'installation. Elle comprend l'acquisition et la préparation des lieux et une estimation de toute exigence spéciale. Il faut justifier les besoins en fonds de prévoyance à l'aide d’évaluations détaillées des risques, notamment les facteurs du marché, le potentiel industriel et les considérations relatives à la main-d’œuvre. 4, fiche 3, Français, - estimation%20de%20co%C3%BBt%20fond%C3%A9e
Record number: 3, Textual support number: 1 OBS
[L’estimation de coût fondée] repose sur des études détaillées des systèmes et des éléments et tient compte de tous les objectifs et résultats prévus du projet. 3, fiche 3, Français, - estimation%20de%20co%C3%BBt%20fond%C3%A9e
Fiche 3, Espagnol
Fiche 3, Justifications, Espagnol
Fiche 4 - données d’organisme interne 2011-11-21
Fiche 4, Anglais
Fiche 4, Subject field(s)
- Engineering
Fiche 4, La vedette principale, Anglais
- Front End Engineering Design
1, fiche 4, Anglais, Front%20End%20Engineering%20Design
correct
Fiche 4, Les abréviations, Anglais
- FEED 1, fiche 4, Anglais, FEED
correct
Fiche 4, Les synonymes, Anglais
- front-end engineering design 2, fiche 4, Anglais, front%2Dend%20engineering%20design
- basic engineering design 4, fiche 4, Anglais, basic%20engineering%20design
- basic engineering 5, fiche 4, Anglais, basic%20engineering
Fiche 4, Justifications, Anglais
Record number: 4, Textual support number: 1 DEF
The stage of a project beyond conceptual design, but before detailed design. 6, fiche 4, Anglais, - Front%20End%20Engineering%20Design
Record number: 4, Textual support number: 1 OBS
The objective of the FEED study is to define the project's scope to a degree such that uncertainty and hence cost increases are minimised during the execution phase. A FEED study typically involves preparation of preliminary design documentation, cost estimates, procurement requirements, a project schedule and risk assessment. 6, fiche 4, Anglais, - Front%20End%20Engineering%20Design
Fiche 4, Terme(s)-clé(s)
- F.E.E.D.
Fiche 4, Français
Fiche 4, Domaine(s)
- Ingénierie
Fiche 4, La vedette principale, Français
- ingénierie de base
1, fiche 4, Français, ing%C3%A9nierie%20de%20base
correct, nom féminin
Fiche 4, Les abréviations, Français
Fiche 4, Les synonymes, Français
- ingénierie préliminaire 2, fiche 4, Français, ing%C3%A9nierie%20pr%C3%A9liminaire
correct, nom féminin
Fiche 4, Justifications, Français
Record number: 4, Textual support number: 1 DEF
Ensemble des activités de conception et d’étude technique d’un projet. 3, fiche 4, Français, - ing%C3%A9nierie%20de%20base
Record number: 4, Textual support number: 1 CONT
Initier l'étudiant au processus de réalisation des projets. Étapes de réalisation des projets : étude de faisabilité, étude d’impact, analyse financière, ingénierie préliminaire, ingénierie détaillée, réalisation. Gestion des projets : échéancier, logiciels de gestion de projet, estimation des besoins, gestion des ressources [...] 2, fiche 4, Français, - ing%C3%A9nierie%20de%20base
Record number: 4, Textual support number: 1 OBS
Dans la mise en œuvre d’un projet, l’«ingénierie de base» précède l’«ingénierie de détail». 3, fiche 4, Français, - ing%C3%A9nierie%20de%20base
Record number: 4, Textual support number: 2 OBS
ingénierie de base : terme et définition publiés au Journal officiel de la République française le 25 avril 2009. 4, fiche 4, Français, - ing%C3%A9nierie%20de%20base
Fiche 4, Espagnol
Fiche 4, Campo(s) temático(s)
- Ingeniería
Fiche 4, La vedette principale, Espagnol
- ingeniería de base
1, fiche 4, Espagnol, ingenier%C3%ADa%20de%20base
correct, nom féminin
Fiche 4, Les abréviations, Espagnol
Fiche 4, Les synonymes, Espagnol
Fiche 4, Justifications, Espagnol
Fiche 5 - données d’organisme interne 2009-08-07
Fiche 5, Anglais
Fiche 5, Subject field(s)
- Engineering
Fiche 5, La vedette principale, Anglais
- detail engineering 1, fiche 5, Anglais, detail%20engineering
Fiche 5, Les abréviations, Anglais
Fiche 5, Les synonymes, Anglais
Fiche 5, Justifications, Anglais
Record number: 5, Textual support number: 1 CONT
Profile: development of basic engineering, detail engineering, industrial construction, and special studies in the environmental field. 1, fiche 5, Anglais, - detail%20engineering
Fiche 5, Français
Fiche 5, Domaine(s)
- Ingénierie
Fiche 5, La vedette principale, Français
- ingénierie détaillée
1, fiche 5, Français, ing%C3%A9nierie%20d%C3%A9taill%C3%A9e
correct, nom féminin
Fiche 5, Les abréviations, Français
Fiche 5, Les synonymes, Français
Fiche 5, Justifications, Français
Record number: 5, Textual support number: 1 CONT
Initier l'étudiant au processus de réalisation des projets. Étapes de réalisation des projets : étude de faisabilité, étude d’impact, analyse financière, ingénierie préliminaire, ingénierie détaillée, réalisation. Gestion des projets : échéancier, logiciels de gestion de projet, estimation des besoins, gestion des ressources [...] 1, fiche 5, Français, - ing%C3%A9nierie%20d%C3%A9taill%C3%A9e
Fiche 5, Espagnol
Fiche 5, Campo(s) temático(s)
- Ingeniería
Fiche 5, La vedette principale, Espagnol
- ingeniería de detalle
1, fiche 5, Espagnol, ingenier%C3%ADa%20de%20detalle
correct, nom féminin
Fiche 5, Les abréviations, Espagnol
Fiche 5, Les synonymes, Espagnol
- ingeniería detallada 2, fiche 5, Espagnol, ingenier%C3%ADa%20detallada
correct, nom féminin
Fiche 5, Justifications, Espagnol
Fiche 6 - données d’organisme interne 2003-03-04
Fiche 6, Anglais
Fiche 6, Subject field(s)
- Government Contracts
- Estimating (Construction)
Fiche 6, La vedette principale, Anglais
- detailed estimate of cost
1, fiche 6, Anglais, detailed%20estimate%20of%20cost
correct
Fiche 6, Les abréviations, Anglais
Fiche 6, Les synonymes, Anglais
- detailed estimate 2, fiche 6, Anglais, detailed%20estimate
correct
- detailed cost estimate 3, fiche 6, Anglais, detailed%20cost%20estimate
correct
Fiche 6, Justifications, Anglais
Record number: 6, Textual support number: 1 CONT
During the design development stage, ... outline specifications are prepared. Thus, a more definite basis is provided for a more detailed cost estimate, which should also be prepared. The method used for preparing this cost estimate is similar to that employed in preparing the [preliminary] cost estimate during the schematic-design stage. It is based upon unit cost per square foot or metre, unit cost per cubic foot or metre, or cost per occupancy unit. 4, fiche 6, Anglais, - detailed%20estimate%20of%20cost
Fiche 6, Français
Fiche 6, Domaine(s)
- Marchés publics
- Évaluation et estimation (Construction)
Fiche 6, La vedette principale, Français
- estimation détaillée des coûts
1, fiche 6, Français, estimation%20d%C3%A9taill%C3%A9e%20des%20co%C3%BBts
correct, nom féminin
Fiche 6, Les abréviations, Français
Fiche 6, Les synonymes, Français
- estimation détaillée 2, fiche 6, Français, estimation%20d%C3%A9taill%C3%A9e
correct, nom féminin
Fiche 6, Justifications, Français
Record number: 6, Textual support number: 1 CONT
En consultation avec le gestionnaire du projet désigné par le conseil de bande, préparer des instructions sur des questions techniques à l'intention des soumissionnaires; elles doivent comprendre une ventilation détaillée des quantités et des unités de mesure(lorsque cela est pertinent), une estimation détaillée des coûts et fixer la date du parachèvement des travaux prévus dans le marché. 1, fiche 6, Français, - estimation%20d%C3%A9taill%C3%A9e%20des%20co%C3%BBts
Record number: 6, Textual support number: 1 OBS
L’estimation est obtenue en faisant le produit des nombres figurant à la colonne «quantités» par ceux figurant à la colonne «prix unitaires». 3, fiche 6, Français, - estimation%20d%C3%A9taill%C3%A9e%20des%20co%C3%BBts
Fiche 6, Espagnol
Fiche 6, Justifications, Espagnol
Fiche 7 - données d’organisme interne 2001-05-30
Fiche 7, Anglais
Fiche 7, Subject field(s)
- Taxation
- Operating Systems (Software)
- Personnel Management (General)
Fiche 7, La vedette principale, Anglais
- trip request
1, fiche 7, Anglais, trip%20request
correct
Fiche 7, Les abréviations, Anglais
Fiche 7, Les synonymes, Anglais
Fiche 7, Justifications, Anglais
Record number: 7, Textual support number: 1 CONT
An employee, before going on a trip, must complete a form (GC72 Travel Authority and Advance) requesting approval for travel providing with a detailed estimate of anticipated costs. This trip request is entered into CAS. 1, fiche 7, Anglais, - trip%20request
Fiche 7, Français
Fiche 7, Domaine(s)
- Fiscalité
- Systèmes d'exploitation (Logiciels)
- Gestion du personnel (Généralités)
Fiche 7, La vedette principale, Français
- demande de déplacement
1, fiche 7, Français, demande%20de%20d%C3%A9placement
correct, nom féminin
Fiche 7, Les abréviations, Français
Fiche 7, Les synonymes, Français
Fiche 7, Justifications, Français
Record number: 7, Textual support number: 1 CONT
Avant d’aller en déplacement, un employé doit remplir un formulaire(GC72 Autorisation et avances de déplacement) qui demande l'autorisation de se déplacer et produit une estimation détaillée des coûts prévus. Cette demande de déplacement est entrée dans les SAE. 1, fiche 7, Français, - demande%20de%20d%C3%A9placement
Fiche 7, Espagnol
Fiche 7, Justifications, Espagnol
Fiche 8 - données d’organisme interne 2001-01-15
Fiche 8, Anglais
Fiche 8, Subject field(s)
- Various Proper Names
- Management Operations (General)
Fiche 8, La vedette principale, Anglais
- Design Development 1, fiche 8, Anglais, Design%20Development
Fiche 8, Les abréviations, Anglais
Fiche 8, Les synonymes, Anglais
Fiche 8, Justifications, Anglais
Record number: 8, Textual support number: 1 OBS
Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications. 2, fiche 8, Anglais, - Design%20Development
Record number: 8, Textual support number: 2 OBS
The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team. 2, fiche 8, Anglais, - Design%20Development
Fiche 8, Français
Fiche 8, Domaine(s)
- Appellations diverses
- Opérations de la gestion (Généralités)
Fiche 8, La vedette principale, Français
- Avant-projet
1, fiche 8, Français, Avant%2Dprojet
nom masculin
Fiche 8, Les abréviations, Français
Fiche 8, Les synonymes, Français
Fiche 8, Justifications, Français
Record number: 8, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis. 2, fiche 8, Français, - Avant%2Dprojet
Record number: 8, Textual support number: 2 OBS
Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire. 2, fiche 8, Français, - Avant%2Dprojet
Fiche 8, Espagnol
Fiche 8, Justifications, Espagnol
Fiche 9 - données d’organisme interne 1999-05-14
Fiche 9, Anglais
Fiche 9, Subject field(s)
- Titles of Reports
- Management Operations (General)
Fiche 9, La vedette principale, Anglais
- Preliminary Design Report 1, fiche 9, Anglais, Preliminary%20Design%20Report
Fiche 9, Les abréviations, Anglais
Fiche 9, Les synonymes, Anglais
Fiche 9, Justifications, Anglais
Record number: 9, Textual support number: 1 OBS
Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications. 2, fiche 9, Anglais, - Preliminary%20Design%20Report
Record number: 9, Textual support number: 2 OBS
The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team. 2, fiche 9, Anglais, - Preliminary%20Design%20Report
Fiche 9, Français
Fiche 9, Domaine(s)
- Titres de rapports
- Opérations de la gestion (Généralités)
Fiche 9, La vedette principale, Français
- Rapport de conception préliminaire
1, fiche 9, Français, Rapport%20de%20conception%20pr%C3%A9liminaire
nom masculin
Fiche 9, Les abréviations, Français
Fiche 9, Les synonymes, Français
Fiche 9, Justifications, Français
Record number: 9, Textual support number: 1 OBS
Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis. 2, fiche 9, Français, - Rapport%20de%20conception%20pr%C3%A9liminaire
Record number: 9, Textual support number: 2 OBS
Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire. 2, fiche 9, Français, - Rapport%20de%20conception%20pr%C3%A9liminaire
Fiche 9, Espagnol
Fiche 9, Justifications, Espagnol
Fiche 10 - données d’organisme interne 1998-02-04
Fiche 10, Anglais
Fiche 10, Subject field(s)
- Titles of Monographs
- Environment
- Urban Housing
Fiche 10, La vedette principale, Anglais
- Estimating the Concentrations of Soil Gas Pollutants in Housing: a step-by-step method
1, fiche 10, Anglais, Estimating%20the%20Concentrations%20of%20Soil%20Gas%20Pollutants%20in%20Housing%3A%20a%20step%2Dby%2Dstep%20method
correct, Canada
Fiche 10, Les abréviations, Anglais
Fiche 10, Les synonymes, Anglais
Fiche 10, Justifications, Anglais
Record number: 10, Textual support number: 1 OBS
Published in 1997 par the Canada Mortgage and Housing Corporation. 1, fiche 10, Anglais, - Estimating%20the%20Concentrations%20of%20Soil%20Gas%20Pollutants%20in%20Housing%3A%20a%20step%2Dby%2Dstep%20method
Fiche 10, Terme(s)-clé(s)
- Estimating the Concentrations of Soil Gas Pollutants in Housing
Fiche 10, Français
Fiche 10, Domaine(s)
- Titres de monographies
- Environnement
- Habitation et logement (Urbanisme)
Fiche 10, La vedette principale, Français
- Estimation des concentrations de gaz souterrains polluants dans les habitations : méthode détaillée étape par étape
1, fiche 10, Français, Estimation%20des%20concentrations%20de%20gaz%20souterrains%20polluants%20dans%20les%20habitations%20%3A%20m%C3%A9thode%20d%C3%A9taill%C3%A9e%20%C3%A9tape%20par%20%C3%A9tape
correct, nom féminin, Canada
Fiche 10, Les abréviations, Français
Fiche 10, Les synonymes, Français
Fiche 10, Justifications, Français
Record number: 10, Textual support number: 1 OBS
Publié en 1997 par la Société canadienne d’hypothèques et de logement. 1, fiche 10, Français, - Estimation%20des%20concentrations%20de%20gaz%20souterrains%20polluants%20dans%20les%20habitations%20%3A%20m%C3%A9thode%20d%C3%A9taill%C3%A9e%20%C3%A9tape%20par%20%C3%A9tape
Fiche 10, Terme(s)-clé(s)
- Estimation des concentrations de gaz souterrains polluants dans les habitations
Fiche 10, Espagnol
Fiche 10, Justifications, Espagnol
Fiche 11 - données d’organisme interne 1991-04-02
Fiche 11, Anglais
Fiche 11, Subject field(s)
- Architectural Design
- Engineering
Fiche 11, La vedette principale, Anglais
- final design
1, fiche 11, Anglais, final%20design
correct
Fiche 11, Les abréviations, Anglais
Fiche 11, Les synonymes, Anglais
- detail design 2, fiche 11, Anglais, detail%20design
correct
Fiche 11, Justifications, Anglais
Record number: 11, Textual support number: 1 CONT
Once the preliminary design has been approved by the owner, final or detail design is accomplished.... The detail design phase culminates in the plans and specifications that are given to the constructor for bidding purposes. In addition ..., the architect/engineer produces a final owner's estimate.... 3, fiche 11, Anglais, - final%20design
Fiche 11, Français
Fiche 11, Domaine(s)
- Conception architecturale
- Ingénierie
Fiche 11, La vedette principale, Français
- avant-projet détaillé
1, fiche 11, Français, avant%2Dprojet%20d%C3%A9taill%C3%A9
correct, nom masculin
Fiche 11, Les abréviations, Français
- APD 2, fiche 11, Français, APD
correct, nom masculin
Fiche 11, Les synonymes, Français
- étude de l’avant-projet 3, fiche 11, Français, %C3%A9tude%20de%20l%26rsquo%3Bavant%2Dprojet
correct, nom féminin
- étude d’avant-projets détaillés 4, fiche 11, Français, %C3%A9tude%20d%26rsquo%3Bavant%2Dprojets%20d%C3%A9taill%C3%A9s
correct, nom féminin
- étude des avant-projets détaillés 5, fiche 11, Français, %C3%A9tude%20des%20avant%2Dprojets%20d%C3%A9taill%C3%A9s
correct, nom féminin
- conception détaillée 6, fiche 11, Français, conception%20d%C3%A9taill%C3%A9e
correct, nom féminin
- design final 6, fiche 11, Français, design%20final
nom masculin
Fiche 11, Justifications, Français
Record number: 11, Textual support number: 1 DEF
Recherches et études diverses relatives aux ouvrages sur la base d’une solution d’ensemble retenue sur la base de l'avant-projet sommaire accepté par le maître d’ouvrage. Ces recherches et études ont pour buts essentiels l'approfondissement de la solution d’ensemble au niveau des ouvrages considérés, la présentation des choix architecturaux et techniques ainsi que l'établissement d’une estimation détaillée des dépenses d’exécution. 7, fiche 11, Français, - avant%2Dprojet%20d%C3%A9taill%C3%A9
Record number: 11, Textual support number: 2 DEF
Étude développant la solution retenue aboutissant aux spécifications techniques et aux plans nécessaires à la remise de prix. 2, fiche 11, Français, - avant%2Dprojet%20d%C3%A9taill%C3%A9
Record number: 11, Textual support number: 1 OBS
Le terme français «avant-projet détaillé» et son abréviation, ainsi que cette dernière définition, ont été approuvés par le comité chargé par le Centre international GP d’étudier les termes de la gestion des grands projets. 8, fiche 11, Français, - avant%2Dprojet%20d%C3%A9taill%C3%A9
Fiche 11, Espagnol
Fiche 11, Justifications, Espagnol
Fiche 12 - données d’organisme interne 1989-02-28
Fiche 12, Anglais
Fiche 12, Subject field(s)
- Estimating (Construction)
Fiche 12, La vedette principale, Anglais
- fast estimate 1, fiche 12, Anglais, fast%20estimate
Fiche 12, Les abréviations, Anglais
Fiche 12, Les synonymes, Anglais
Fiche 12, Justifications, Anglais
Fiche 12, Français
Fiche 12, Domaine(s)
- Évaluation et estimation (Construction)
Fiche 12, La vedette principale, Français
- estimation sommaire
1, fiche 12, Français, estimation%20sommaire
correct, nom féminin
Fiche 12, Les abréviations, Français
Fiche 12, Les synonymes, Français
Fiche 12, Justifications, Français
Record number: 12, Textual support number: 1 CONT
Estimation sommaire. L'estimation demandée au dossier du permis de construire n’ est pas une étude détaillée. Elle est obtenue à partir des plans et du devis descriptif. Elle est suffisante pour recevoir l'approbation des organismes compétents. Cette estimation repose sur l'évaluation des quantités et le barème des prix. 2, fiche 12, Français, - estimation%20sommaire
Record number: 12, Textual support number: 2 CONT
L’esquisse [...] est un dessin encore très élémentaire, qui permet de discerner le "parti" adopté par l’architecte [...] et qui donne une estimation très sommaire des prix, établie sur la base du prix de la construction au mètre carré. 3, fiche 12, Français, - estimation%20sommaire
Fiche 12, Espagnol
Fiche 12, Justifications, Espagnol
Avis de droit d’auteur pour la banque de données TERMIUM Plus®
© Services publics et Approvisionnement Canada, 2026
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction
En vedette
GCtraduction (accessible uniquement sur le réseau du gouvernement du Canada)
Utilisez ce prototype d’intelligence artificielle pour traduire le contenu du gouvernement du Canada jusqu’au niveau Protégé B inclusivement. Réservé au personnel de certains ministères et organismes.
Outils d'aide à la rédaction
Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.
Lexiques et vocabulaires
Accédez aux lexiques et vocabulaires du Bureau de la traduction.
- Date de modification :