TERMIUM Plus®

Par le Bureau de la traduction

Dans les médias sociaux

Consultez la banque de données terminologiques du gouvernement du Canada.

ESTIMATION ENSEMBLE [24 fiches]

Fiche 1 2025-03-27

Anglais

Subject field(s)
  • Internet and Telematics
  • Telecommunications Transmission
  • Simulation (Cybernetic Systems)
  • Collaboration with WIPO
CONT

In a communication system, the end-to-end delay of a packet may be defined as the time from its generation at the source to when the packet reaches its destination. In a packet-switched communication system, the delay for packets to travel from source to destination may vary depending upon various operating conditions, including but not limited to, channel conditions and network loading. Channel conditions refer to the quality of the wireless link. Some factors determining the quality of the wireless link are signal strength, speed of a mobile and/or physical obstructions. The end-to-end delay includes the delays introduced in the network and the various elements through which the packet passes. Many factors contribute to end-to-end delay. Variance in the end-to-end delay is referred to as jitter.

CONT

... when the remote clock frequency is consistently higher than the local clock frequency, the end-to-end system delay increases. When the remote clock frequency is consistently lower than the local clock frequency, the end-to-end system delay decreases. When the current value differs from the stored value for end-to-end delay by a value equal to one frame, and other external criteria are met, a frame is either dropped or added.

OBS

end-to-end delay; end-to-end system delay: data validated by Canadian subject-field experts from École Polytechnique de Montréal, MasterpieceVR and McGill University.

Français

Domaine(s)
  • Internet et télématique
  • Transmission (Télécommunications)
  • Simulation (Systèmes cybernétiques)
  • Collaboration avec l'OMPI
CONT

À partir de ce modèle markovien, le délai de bout en bout est ensuite obtenu par une approche analytique basée sur une analyse dans le domaine fréquentiel pour calculer la probabilité de distribution de délais pour un taux d’arrivé spécifique. Afin d’obtenir une estimation du délai de bout en bout, indépendamment du trafic en entrée, la technique de régression non-linéaire est utilisée à un ensemble d’échantillons limités.

CONT

Pour un chemin réseau qui permet l’acheminement de paquets entre un nœud expéditeur et un nœud destinataire, on définit la notion de délai de bout-en-bout. […] le délai de bout-en-bout constitue avec le débit, le taux de perte et le taux d’utilisation une des principales métriques de performances en réseau.

Espagnol

Campo(s) temático(s)
  • Internet y telemática
  • Transmisión (Telecomunicaciones)
  • Simulación (Sistemas cibernéticos)
  • Colaboración con la OMPI
CONT

Un paquete de flujo elemental consiste en una cabecera de paquete, que incluye una referencia temporal, seguida de un número de bytes contiguos pertenecientes al flujo de datos elemental. Dicha referencia temporal es relativa a la referencia de sincronismo común transportada en el flujo de transporte. Según esta referencia de tiempo, el retardo de extremo a extremo[, es decir] desde la entrada de señal a un codificador hasta la salida de señal desde un decodificador[,] es constante.

CONT

Desde el punto de vista de las comunicaciones se entiende como retraso el tiempo que se tarda desde que un dispositivo recibe una trama hasta que la trama es retransmitida hacia el puerto correspondiente. Y [se habla de] "retraso de extremo a extremo" (end to end) como el retraso total que los paquetes experimentan desde la fuente al destino, es decir desde que inician su trayecto hasta que llegan al destino final.

Conserver la fiche 1

Fiche 2 2025-03-25

Anglais

Subject field(s)
  • Probability (Statistics)
  • Artificial Intelligence
CONT

The cross-entropy method (CEM) is a probabilistic optimization technique that iteratively fits an initial distribution to elite samples. The method uses importance sampling, which introduces a proposal distribution over rare events to sample from then re-weights the posterior likelihood by the likelihood ratio of the true distribution ... over the proposal distribution. The idea is to artificially make failure events less rare under the newly fit proposal distribution.

Français

Domaine(s)
  • Probabilités (Statistique)
  • Intelligence artificielle
CONT

La méthode de l'entropie croisée est une méthode générique récente d’estimation d’événements rares, adaptable à des problèmes d’optimisation. Elle se base sur un algorithme probabiliste dans lequel des densités de probabilités évoluent pour converger vers une densité fournissant un ensemble contenant la ou les solutions optimales. Cette méthode utilise donc une population de solutions à chaque itération, population générée selon des densités de probabilité.

Espagnol

Conserver la fiche 2

Fiche 3 2023-05-03

Anglais

Subject field(s)
  • Occupation Names (General)
  • Meteorological Forecasting, Data Measurement and Analysis
  • Atmospheric, Climatic and Meteorological Phenomena
CONT

As an avalanche forecaster, she knows how to predict when snow is likely to slide. And she tries to communicate this danger to backcountry recreationists. ... [Avalanche forecasters] analyze conditions on the slopes of ... mountains ... and then publish advisories using an international avalanche danger scale. The terrain they study is vast and varied.

CONT

... experienced avalanche forecasters ... will have made observations in the field of the current snow and meteorological conditions. They will not use any computer forecasting system in isolation, but rather as a tool to aid them in making their decision on the level of avalanche hazard on a particular day.

CONT

Avalanche forecasters continue to expect improving conditions. [Example approved by the Avalanche Bulletin Terminology Standardization Committee.]

OBS

avalanche forecaster: term officially approved by the Avalanche Bulletin Terminology Standardization Committee.

Français

Domaine(s)
  • Désignations des emplois (Généralités)
  • Prévisions météorologiques et mesure et analyse des données
  • Phénomènes météorologiques, climatiques et atmosphériques
CONT

Les causes [de déclenchement d’une avalanche] proviennent le plus souvent de conditions météorologiques datant de plusieurs jours, voire de plusieurs semaines, ces conditions ayant entraîné la formation de couches fragiles, responsables d’une mauvaise liaison entre les couches supérieures et le reste du manteau neigeux. [...] Conséquence de l'interaction de nombreux paramètres, dont certains sont difficilement quantifiables ou encore mal connus, le risque d’avalanche n’ est pas mesurable. Son estimation ne peut donc s’envisager que dans le cadre d’une expertise humaine. Une fois fixées les échelles de travail dans l'espace et dans le temps, le prévisionniste avalanche base son expertise sur un ensemble de mesures et d’observations effectuées sur et dans le manteau neigeux.

CONT

Les prévisionnistes avalanches prévoient une amélioration des conditions avalancheuses. [Exemple entériné par le Comité d’uniformisation de la terminologie des bulletins d’avalanche.]

OBS

Un prévisionniste d’avalanche [...] évalue les risques d’avalanche selon l’état du manteau neigeux, le terrain et le temps.

OBS

prévisionniste avalanche; prévisionniste d’avalanche : termes uniformisés par le Comité d’uniformisation de la terminologie des bulletins d’avalanche.

Espagnol

Conserver la fiche 3

Fiche 4 2023-01-10

Anglais

Subject field(s)
  • Business and Administrative Documents
  • Financial and Budgetary Management

Français

Domaine(s)
  • Écrits commerciaux et administratifs
  • Gestion budgétaire et financière
DEF

Document exposant les objectifs, les coûts et les avantages d’un projet, soumis à la décision d’un supérieur hiérarchique.

CONT

[Une] «demande motivée» désigne l'ensemble des documents préparés en vue d’obtenir l'approbation de projets [ou] de programmes par des gestionnaires supérieurs. Ces documents incluent souvent des justificatifs, des évaluations de risques, une description de l'impact du projet sur les partenariats internes et externes, une estimation des coûts, les avantages qu'on pourra en tirer, etc.

Espagnol

Campo(s) temático(s)
  • Documentos comerciales y administrativos
  • Gestión presupuestaria y financiera
CONT

En los contratos número 1, 7, 8, 34, 35, 45, 61 y 72 del Anexo VII, no se ha aportado el informe del servicio promotor del expediente justificativo de la necesidad de la contratación.

Conserver la fiche 4

Fiche 5 2017-04-20

Anglais

Subject field(s)
  • Nuclear Plant Safety
CONT

[The] US Nuclear Regulatory Commission … believes designers should consider several reactor characteristics, including [features] that prevent a simultaneous breach of containment and loss of core cooling from an aircraft impact, or that inherently delay any radiological release …

Français

Domaine(s)
  • Sûreté des centrales nucléaires
CONT

Les études menées […] ont permis d’identifier un ensemble de scénarii non pris en compte à ce jour dans l'estimation des rejets radioactifs en cas d’accident grave […] Les situations pouvant conduire à ces scénarii sont la perte du refroidissement du cœur dans le cas d’un réacteur à l'arrêt(cuve ouverte) ou la percée de la cuve après un accident de fusion du cœur.

Espagnol

Conserver la fiche 5

Fiche 6 2017-01-24

Anglais

Subject field(s)
  • Urban Planning

Français

Domaine(s)
  • Aménagement urbain
DEF

Ensemble des études et documents qui permettent de se livrer à une estimation approchée des moyens nécessaires à la mise en œuvre d’un aménagement ainsi que de ses conséquences.

Espagnol

Conserver la fiche 6

Fiche 7 2015-11-06

Anglais

Subject field(s)
  • IT Security
DEF

An aspect of the assessment of the effectiveness of a target of evaluation, namely the ability of its security enforcing functions and mechanisms to work together in a way which is mutually supportive and provides and integrated and effective whole.

Français

Domaine(s)
  • Sécurité des TI
DEF

Aspect de l'estimation de l'efficacité d’une cible d’évaluation qui recouvre la mesure dans laquelle les fonctions de sécurité de la cible d’évaluation coopèrent d’une manière qui les fait se soutenir mutuellement pour fournir un ensemble intégré et efficace. [Définition reproduite avec l'autorisation de l'AFNOR. ]

Espagnol

Conserver la fiche 7

Fiche 8 2015-03-05

Anglais

Subject field(s)
  • Economic Conditions and Forecasting
  • Economic and Industrial Sociology
DEF

A range of data of the same type or linked to the same concept, assembled in order to estimate the magnitude of a set of data which is not directly accessible to observation or measurement. Used especially in economics and in economic or social accounting.

Français

Domaine(s)
  • Prévisions et conjonctures économiques
  • Sociologie économique et industrielle
DEF

Ensemble d’éléments de même nature ou liés à un même concept, réunis dans le but d’obtenir une estimation d’un ensemble non directement accessible à l'observation ou à la mesure. Particulièrement utilisé en économie et en comptabilité économique ou sociale.

Espagnol

Conserver la fiche 8

Fiche 9 2014-01-30

Anglais

Subject field(s)
  • Mathematics
CONT

As such, a set of default uncertainties ... was used in the analysis. The following default uncertainties were applied when survey uncertainties were not provided: capacity data ... reported production data ... capacity share fractions used for allocation of national production data ...

Français

Domaine(s)
  • Mathématiques
CONT

C'est pourquoi un ensemble de valeurs d’incertitude par défaut [...] a été utilisé aux fins de l'analyse. Quand aucune estimation de l'incertitude n’ était fournie, les degrés d’incertitude suivants ont été appliqués par défaut : données sur la capacité [...] données sur la production déclarée [...] fractions de la proportion de la capacité utilisées pour la répartition des données nationales sur la production [...]

Espagnol

Conserver la fiche 9

Fiche 10 2011-10-13

Anglais

Subject field(s)
  • Engineering
  • Architectural Drafting and Tools
CONT

The document announcing to prospective bidders that design documents are available for consideration ... is called the notiGETto bidders. ... sets of plans and specifications are available for perusal ... at plans rooms....

OBS

design package : Constructed on the model of "bid package" (HALCO, 1980, p. 27).

Français

Domaine(s)
  • Ingénierie
  • Dessin architectural et instruments
DEF

Ensemble de documents formés par le plan de masse, le plan, les coupes, les élévations à petite échelle, le devis descriptif sommaire et l'estimation globale du coût des travaux de construction et ouvrages extérieurs.

Espagnol

Conserver la fiche 10

Fiche 11 2011-05-18

Anglais

Subject field(s)
  • Architectural Design
DEF

The second phase of the architect's basic services, in which the architect prepares for approval by the owner, the design development documents to fix and describe the size and character of the entire project as to structural, mechanical and electrical systems, etc.

CONT

During the design-development stage, the architect ... collaborates with other consultants.... Also during this stage, outline specifications are prepared ... [as well as] a more detailed cost estimate....

Français

Domaine(s)
  • Conception architecturale
CONT

[...] les avant-projets sont établis en deux stades : l’avant-projet sommaire [...] [et] l’avant-projet détaillé [...]

OBS

études d’avant-projets : [...] les études d’avant-projets, sommaires et détaillés, permettent de préciser les caractéristiques des ouvrages ainsi que leurs coûts [...]

OBS

stade de l’avant-projet détaillé : Au stade de l’avant-projet détaillé, le tracé de l’autoroute et la plupart de ses ponts sont calculés [...]

OBS

L'avant projet est, en matière de bâtiment, l'ensemble des dessins [...] servant de base aux calculs, à l'estimation sommaire du coût des travaux et enfin à l'exécution du projet d’exécution.

OBS

La mise au singulier de «avant-projet» n’est pas approprié car il y en a au moins deux avant-projets.

Espagnol

Conserver la fiche 11

Fiche 12 2010-12-09

Anglais

Subject field(s)
  • Financial Accounting
Terme(s)-clé(s)
  • percentage of outstanding receivables method
  • percentage of receivables method

Français

Domaine(s)
  • Comptabilité générale
DEF

Méthode d’estimation des créances douteuses fondée sur une analyse de l'état de l'ensemble des créances non encore recouvrées à la date de clôture de la période, analyse faite à partir de l'expérience antérieure de l'entité relativement aux créances qui se sont avérées irrécouvrables.

Espagnol

Conserver la fiche 12

Fiche 13 2006-01-12

Anglais

Subject field(s)
  • Computer Graphics
  • Audiovisual Techniques and Equipment
DEF

The selection, based on prior coding decisions, of one estimate out of a set of conditional probability estimates (in arithmetic coding).

OBS

Source: Information Technology Vocabulary, extract of ISO/IEC 10918-1 (F/E).

Français

Domaine(s)
  • Infographie
  • Audiovisuel (techniques et équipement)
DEF

Sélection, fondée sur des décisions de codage antérieures, d’une estimation, à partir d’un ensemble d’estimations de probabilité conditionnelles.

OBS

Source : Vocabulaire des technologies de l’information, extrait de l’ISO/CEI 10918-1 (F/E).

Espagnol

Conserver la fiche 13

Fiche 14 2005-09-01

Anglais

Subject field(s)
  • Computer Graphics
  • Audiovisual Techniques and Equipment
DEF

The set of previously coded binary decisions which is used to create the index to the probability estimation state machine (in arithmetic coding).

OBS

Information Technology Vocabulary, extract of ISO/IEC 10918-1 (F/E).

Français

Domaine(s)
  • Infographie
  • Audiovisuel (techniques et équipement)
DEF

Ensemble des décisions binaires antérieurement codées qui est utilisé pour créer l'indice de la machine à états d’estimation de probabilité(en codage arithmétique).

OBS

Vocabulaire des technologies de l’information, extrait de l’ISO/CEI 10918-1 (F/E).

Espagnol

Conserver la fiche 14

Fiche 15 - données d’organisme externe 2005-02-22

Anglais

Subject field(s)
  • Special-Language Phraseology
  • Nuclear Science and Technology
  • Compartment - Canadian Nuclear Safety Commission
CONT

The description of each decommissioning work package includes an overview of the step-wise technical approach, the nature and source of any potentially significant risks to the workers, public and environment, including estimates of doses ...

Français

Domaine(s)
  • Phraséologie des langues de spécialité
  • Sciences et techniques nucléaires
  • Tiroir - Commission canadienne de sûreté nucléaire
CONT

La description de chaque ensemble de travaux de déclassement présente un aperçu de l'approche technique étape par étape, de la nature et la source de tout risque important pour les travailleurs, le public et l'environnement, y compris une estimation des doses de rayonnement [...]

Espagnol

Conserver la fiche 15

Fiche 16 2004-10-22

Anglais

Subject field(s)
  • Atmospheric, Climatic and Meteorological Phenomena
  • Climatology
  • Hydrology and Hydrography
CONT

cloud amount: Amount of sky estimated to be covered by a specified cloud type (partial cloud amount), or by all cloud types (total cloud amount). In either case the estimate is made to the nearest okta (eighth) and is reported on a scale which is essentially one of the 'nearest eighth'.

Français

Domaine(s)
  • Phénomènes météorologiques, climatiques et atmosphériques
  • Climatologie
  • Hydrologie et hydrographie
DEF

Fraction du ciel couverte par les nuages d’un certain genre, d’une certaine espèce, d’une certaine variété, d’une certaine couche, ou par une certaine combinaison de nuages.

OBS

Si on tient compte, dans l'estimation de la nébulosité, de l'ensemble des nuages visibles, quels qu'ils soient, on appellera "nébulosité totale" cet examen de la portion du ciel couverte par les nuages.

Espagnol

Campo(s) temático(s)
  • Fenómenos meteorológicos, climáticos y atmosféricos
  • Climatología
  • Hidrología e hidrografía
Conserver la fiche 16

Fiche 17 2004-06-01

Anglais

Subject field(s)
  • General Scientific and Technical Vocabulary
  • Soil Science
DEF

That part of the total (the estimate from a sample minus the population value) associated with using only a fraction of the population and extrapolating to the whole, as distinct from analytical or test error.

OBS

It rises from a lack of homogeneity in the parent population.

OBS

Terms and definition standarized by ISO.

Français

Domaine(s)
  • Vocabulaire technique et scientifique général
  • Science du sol
DEF

Partie de l'erreur totale(écart entre l'estimation à partir d’un échantillon et la valeur réelle de la population) associée à l'extrapolation, à l'ensemble d’une population, des résultats d’une étude portant sur une petite fraction de la population.

OBS

Distincte de l’erreur analytique ou de l’erreur d’essai, elle est due à un manque d’homogénéité de la population initiale.

OBS

Terme et définition normalisés par ISO.

Espagnol

Campo(s) temático(s)
  • Vocabulario técnico y científico general
  • Ciencia del suelo
DEF

Cada uno de los errores originados por el procedimiento de muestro, tales como las fluctuaciones o sesgos alrededor del parámetro o parámetros poblacionales, o por la variabilidad de los estimadores empleados.

Conserver la fiche 17

Fiche 18 2001-01-15

Anglais

Subject field(s)
  • Various Proper Names
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

Français

Domaine(s)
  • Appellations diverses
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Espagnol

Conserver la fiche 18

Fiche 19 1999-05-14

Anglais

Subject field(s)
  • Titles of Reports
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

Français

Domaine(s)
  • Titres de rapports
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L’objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l’expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l’expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l’expert-conseil et qu’on fera connaître l’avis des SI et du client à l’expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l’équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l’expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et (ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Espagnol

Conserver la fiche 19

Fiche 20 1995-12-18

Anglais

Subject field(s)
  • Organization Planning
  • Economic Planning
DEF

The quantitative and qualitative analysis and evaluation of the effectiveness, consistency and feasibility of the functions, techniques, processes and activities associated with a project to determine the necessary steps for continuation, improvement, correction or discontinuation.

Français

Domaine(s)
  • Planification d'organisation
  • Planification économique
OBS

Analyser un projet consiste (...) à comparer des utilisations de ressources et des revenus ou avantages futurs étalés sur une certaine période de temps.

OBS

(...) un projet doit faire l'objet d’un ensemble d’analyses qui doivent porter sur six principaux éléments : les conditions juridiques et fiscales(...) ;les schémas d’organisation prévus; l'estimation des coûts d’investissement et d’exploitation ainsi que des recettes et avantages prévus; la recherche des moyens financiers qui pourront être mobilisés pour la réalisation; enfin, la comparaison entre les coûts et les recettes ou avantages attendus.

Espagnol

Campo(s) temático(s)
  • Planificación de organización
  • Planificación económica
DEF

Es un sistema analítico que compara los costos con los beneficios, a fin de determinar si un proyecto propuesto, dadas las opciones, fomentará en grado suficiente el objetivo de la entidad desde cuyo punto de vista está llevándose a cabo el análisis, como para justificar el que se emprenda el proyecto.

Terme(s)-clé(s)
  • análisis de proyecto
Conserver la fiche 20

Fiche 21 1991-10-14

Anglais

Subject field(s)
  • Statistical Surveys

Français

Domaine(s)
  • Sondages et enquêtes (Statistique)

Espagnol

Conserver la fiche 21

Fiche 22 1991-04-02

Anglais

Subject field(s)
  • Architectural Design
  • Engineering
CONT

Once the preliminary design has been approved by the owner, final or detail design is accomplished.... The detail design phase culminates in the plans and specifications that are given to the constructor for bidding purposes. In addition ..., the architect/engineer produces a final owner's estimate....

Français

Domaine(s)
  • Conception architecturale
  • Ingénierie
DEF

Recherches et études diverses relatives aux ouvrages sur la base d’une solution d’ensemble retenue sur la base de l'avant-projet sommaire accepté par le maître d’ouvrage. Ces recherches et études ont pour buts essentiels l'approfondissement de la solution d’ensemble au niveau des ouvrages considérés, la présentation des choix architecturaux et techniques ainsi que l'établissement d’une estimation détaillée des dépenses d’exécution.

DEF

Étude développant la solution retenue aboutissant aux spécifications techniques et aux plans nécessaires à la remise de prix.

OBS

Le terme français «avant-projet détaillé» et son abréviation, ainsi que cette dernière définition, ont été approuvés par le comité chargé par le Centre international GP d’étudier les termes de la gestion des grands projets.

Espagnol

Conserver la fiche 22

Fiche 23 1988-11-30

Anglais

Subject field(s)
  • Air Pollution
  • Statistical Graphs and Diagrams
  • Mathematical Geography
CONT

Dispersion model. A mathematical representation and solution of the physical processes that result in the spread of pollutants in the atmosphere. The phenomenon of direct interest in predicting the dispersion of pollutants is turbulent diffusion. Consequently dispersion models are sometimes called diffusion models. However, turbulent diffusion and diffusion models are misnomers. ... The spreading is really not due to a "diffusion" phenomenon such as results from molecular collisions but rather is a result of the rapid, irregular motion of lumps of fluid (called eddies) in turbulence.

Français

Domaine(s)
  • Pollution de l'air
  • Diagrammes et graphiques (Statistique)
  • Géographie mathématique
CONT

On a utilisé deux modèles de dispersion : le modèle Lagrangien et le modèle par Trajectoires. Bien que ces deux modèles soient basés sur les mêmes équations, hypothèses et approximations, le modèle par Trajectoires est destiné à estimer les effets produits par les émissions d’un pays quelconque sur les concentrations et les dépôts d’un autre pays, tandis que le modèle Lagrangien convient plutôt pour fournir une estimation d’ensemble du transport des polluants à l'échelle européenne.

OBS

Il faut rappeler qu’un modèle, qui viserait à représenter vraiment la diffusion moléculaire et non la dispersion, pourrait correctement porter le nom de modèle de diffusion. En pratique, dans le langage courant et chez les spécialistes, on confond les termes diffusion et dispersion.

Espagnol

Conserver la fiche 23

Fiche 24 1986-06-06

Anglais

Subject field(s)
  • Statistics
  • Air Pollution
CONT

In a Lagrangian model individual air parcels are followed and the concentration computed for each parcel. Numerical diffusion is avoided, but the disadvantage is that very large computer storage and time is needed. ... Models do not seem to be applicable when frequency statistics of concentrations are needed.

Français

Domaine(s)
  • Statistique
  • Pollution de l'air
CONT

On a utilisé deux modèles de dispersion : le modèle Lagrangien et le modèle par Trajectoires. Bien que ces deux modèles soient basés sur les mêmes équations, hypothèses et approximations, [...] le modèle Lagrangien convient plutôt pour fournir une estimation d’ensemble du transport des polluants à l'échelle européenne.

OBS

On considère à tort le terme "modèle à trajectoire" comme un synonyme de "modèle Lagrangien"; le premier est un type du second.

Espagnol

Conserver la fiche 24

Avis de droit d’auteur pour la banque de données TERMIUM Plus®

© Services publics et Approvisionnement Canada, 2026
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction

En vedette

GCtraduction (accessible uniquement sur le réseau du gouvernement du Canada)

Utilisez ce prototype d’intelligence artificielle pour traduire le contenu du gouvernement du Canada jusqu’au niveau Protégé B inclusivement. Réservé au personnel de certains ministères et organismes.

Outils d'aide à la rédaction

Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.

Lexiques et vocabulaires

Accédez aux lexiques et vocabulaires du Bureau de la traduction.

Date de modification :