Fiche 1 2025-01-22

Anglais

Subject field(s)
  • Government Contracts
  • Government Accounting
CONT

Management can be defined as getting the right things done properly at the right time by making best use of the resources available to do the work. Tasks can be completed by on-site staff or by an outside contractor. This is known as a make or buy policy. The decision of which resource to use affects both the quality and the cost of the job. To maximize the long-term profitability of the building, it is advisable to consider whether on-site staff given their skills, available time and motivation should do the work.

Terme(s)-clé(s)
  • make-or-buy policy

Français

Domaine(s)
  • Marchés publics
  • Comptabilité publique
CONT

La gestion peut se définir comme l'activité qui consiste à bien accomplir ce qui doit être fait au bon moment en utilisant au mieux les personnes dont on dispose pour faire le travail. Le gestionnaire immobilier peut faire accomplir les tâches dont il a la responsabilité en faisant appel au personnel dont il dispose sur place ou en s’assurant des services d’entrepreneurs de l'extérieur. Il s’agit là de la politique du faire ou faire faire. Le choix de la ressource utilisée a une incidence sur la qualité et le coût des travaux. Dans le but de maximiser la rentabilité à long terme de l'immeuble, il est utile de se demander si le personnel dont on dispose sur place a les compétences, le temps et le dynamisme nécessaires pour accomplir le travail envisagé.

Espagnol

Conserver la fiche 1

Fiche 2 2024-04-25

Anglais

Subject field(s)
  • Government Contracts
CONT

Public Services and Procurement Canada ... is the government's central purchasing agent.

Français

Domaine(s)
  • Marchés publics
CONT

Travaux publics et Services gouvernementaux Canada […] joue un rôle important dans les activités quotidiennes du gouvernement du Canada, car il est le fournisseur principal de services pour les ministères et organismes fédéraux. Il les aide à réaliser les objectifs visés par leurs mandats en tant qu'acheteur central, spécialiste des questions linguistiques, gestionnaire de biens immobiliers […]

Espagnol

Conserver la fiche 2

Fiche 3 2014-01-28

Anglais

Subject field(s)
  • Government Positions
  • Library Operations
OBS

Manager, Departmental Library Services (position title); Manager, Library Services (applied title): titles at Corporate Services, Policy and Communications Branch; Public Works and Government Services Canada.

Français

Domaine(s)
  • Postes gouvernementaux
  • Exploitation (Bibliothéconomie)
OBS

gestionnaire, Services de bibliothèque du Ministère(titre de poste) ;gestionnaire, Services de bibliothèque(titre d’usage) : titres à la Direction générale des Services ministériels, politiques et communications; Travaux publics et Services gouvernementaux Canada.

Espagnol

Conserver la fiche 3

Fiche 4 2011-11-10

Anglais

Subject field(s)
  • Organizations, Administrative Units and Committees
  • Statistical Graphs and Diagrams
OBS

When the Business Partnering Model was first presented, the role of a broker within the Director, Human Resources' team had been developed whose responsibility was routing all requests to the appropriate service centre, tracking all requests to ensure service standards were met, and providing information to managers and the team on the status of individual service transactions. After long discussions, the broker role was replaced by a Business Line Team (BLT). This team is part of the Organization and Resourcing Services. On a matrix basis, a team will be set up for each client Branch/SOA. Headed by a Senior Consultant, reporting to the Resourcing Manager, the team represents a mix of skills and resources to meet client needs as defined by a service agreement negotiatied by the Director, Human Resources. The Senior Consultant, BLT and his/her team will work in partnership with the Director, HR team and will provide constant feed back on results and issues impacting service delivery to the client. Members of the BLT team are at all levels of the organization from support to officer. The make up of the Business Line Team is reviewed annually based on client business plans and service agreements. The Business Line Team is the client's single point of access for staffing, organization design and classification request. It is also responsible for providing these services in the most strategic and cost-efficient way for the client. The Director, HR team will keep the BLT abreast of any client issue, general direction and priority that might impact on service delivery.

Français

Domaine(s)
  • Organismes, unités administratives et comités
  • Diagrammes et graphiques (Statistique)
OBS

Confirmé par Services de l'organisation et du ressourcement, Direction générale des ressources humaines, TPSGC [Travaux publics et Services gouvernementaux]. Lorsque le modèle de partenariat d’affaires a été présenté, on a défini le rôle d’un aiguilleur au sein de l'équipe du directeur des Ressources humaines qui devait acheminer toutes les demandes au centre de services approprié, faire le suivi des demandes afin de s’assurer que les services rendus étaient conformes aux normes, et informer les gestionnaires et l'équipe sur l'état d’avancement de chaque opération. Après en avoir discuté longuement, on a remplacé le rôle d’aiguilleur par le concept d’ESA [Équipe de secteur d’activité]. Cette équipe fait partie des Services de l'organisation et du ressourcement. Une équipe sera formée pour chaque direction générale ou OSS client sur une base matricielle. Dirigée par un conseiller principal relevant du gestionnaire, Ressourcement, l'équipe représente un agencement de compétences et de ressources visant à répondre aux besoins des clients, tels qu'ils sont établis dans l'entente de service négociée par le directeur des Ressources humaines. Le conseiller principal de l'ESA et son équipe travailleront en partenariat avec l'équipe du directeur des Ressources humaines et lui fournira continuellement de l'information sur les résultats et sur tout problème touchant la prestation des services au client. Les membres de l'ESA sont de tous les niveaux de l'organisation, de l'employé de soutien à l'agent. La constitution de l'ESA est revue chaque année en fonction des plans d’activités des clients et des ententes de service. L'ESA est le seul point de contact des clients pour les demandes de dotation, de design organisationnel et de classification. Elle est également chargée d’offrir ces services de la façon la plus stratégique et efficiente possible. Le directeur des Ressources humaines tiendra le conseiller principal de l'ESA au courant de tout problèm.

Espagnol

Conserver la fiche 4

Fiche 5 2011-06-30

Anglais

Subject field(s)
  • Trade Names
  • Informatics
OBS

Further to PWGSC [Public Works and Government Services Canada] Year 2000 readiness preparations, Millennium, an upgrade to the Lotus SmartSuite, will be installed on all departmental desktops, prior to the October 1, 1999 infrastructure freeze. Millennium is certified as Year 2000 compliant and consists of upgrades to the Lotus Word Pro, Freelance Graphics, 1-2-3, Approach and Organizer applications. This upgrade will greatly facilitate opening, viewing and modifying attachments. Information regarding the new features of SmartSuite Millennium will be posted on The Source prior to the deployment.

OBS

A trademark of Lotus Development Corporation.

Terme(s)-clé(s)
  • Lotus Millennium

Français

Domaine(s)
  • Appellations commerciales
  • Informatique
OBS

Dans le cadre des préparatifs pour le passage informatique à l'an 2000, TPSGC [Travaux publics et Services gouvernementaux Canada] installera le logiciel Millennium, à savoir une mise à niveau de la suite de bureautique Lotus SmartSuite, sur tous les ordinateurs de bureau du Ministère, avant le gel de l'infrastructure informatique qui entrera en vigueur le 1er octobre. Millennium est certifié conforme aux normes de l'an 2000 et consiste en une mise à niveau des applications Lotus Word Pro, Freelance Graphics, 1-2-3, Approach et Organizer. Cette mise à niveau facilitera grandement l'ouverture, la visualisation et la modification des fichiers joints. Des documents expliquant les nouvelles fonctions des produits SmartSuite Millennium seront publiés dans La Source avant le déploiement de la nouvelle suite de bureautique. Lotus SmartSuite Millennium Edition contient huit applications innovatrices : le tableur Lotus 1-2-3, le diffuseur de documents sur intranet FastSite, le gestionnaire de temps et de contacts Organizer, le traitement de texte Word Pro, le progiciel de présentation graphique Freelance Graphics, la base de données Approach, le logiciel multimédia ScreenCam et le gestionnaire d’informations Internet SmartCenter, sans oublier la reconnaissance vocale intégrée d’IBM ViaVoice.

OBS

Lotus MillenniumMC : Marque de commerce de Lotus Development Corporation.

Espagnol

Conserver la fiche 5

Fiche 6 2009-05-05

Anglais

Subject field(s)
  • Occupation Names (General)
  • Emergency Management
DEF

The official responsible for ensuring a coordinated response at an emergency site.

OBS

The emergency site manager is most often a senior officer from one of the front-line services (fire, police, public works, etc.).

OBS

emergency site manager: term and definition standardized by the Translation Bureau and the Office of Critical Infrastructure Protection and Emergency Preparedness (OCIPEP).

Français

Domaine(s)
  • Désignations des emplois (Généralités)
  • Gestion des urgences
DEF

Agent chargé de veiller à la coordination de l’intervention sur le lieu du sinistre.

OBS

Le gestionnaire du lieu du sinistre est généralement un cadre supérieur d’un service de première ligne(par ex. incendies, police, travaux publics).

OBS

gestionnaire du lieu du sinistre : terme et définition normalisés par le Bureau de la traduction et le Bureau de la protection des infrastructures essentielles et de la protection civile (BPIEPC).

Espagnol

Campo(s) temático(s)
  • Nombramiento de cargos (Generalidades)
  • Gestión de emergencias
Conserver la fiche 6

Fiche 7 2008-05-23

Anglais

Subject field(s)
  • Government Positions
  • Management Operations (General)
CONT

Manager, Innovative Resourcing Services (14-16 FTEs), responsible for providing expert advice on complex and contentious resourcing cases and issues; directing the development and implementation of projects and initiatives of national scope; strategic direction and leadership in the development and implementation of national innovative operational resourcing service delivery/improvement initiatives and solutions and undertakes related research including automation, best practices and emerging trends for application in PWGSC [Public Works and Government Services Canada]; and managing resources allocated to the Division, including staff located in the Matane Satellite Office; and functional responsibility for national resourcing operations.

Français

Domaine(s)
  • Postes gouvernementaux
  • Opérations de la gestion (Généralités)
CONT

gestionnaire, Services de ressourcement innovateurs : poste qui relève du directeur général, Opérations des ressources humaines, Travaux publics et Services gouvernementaux Canada.

Espagnol

Conserver la fiche 7

Fiche 8 2008-05-23

Anglais

Subject field(s)
  • Government Positions
  • Management Operations (General)
CONT

Manager, Regional/Horizontal Classification Services (5 FTEs, + 5 Trainees), responsible for managing the classification operations program in the regions, providing expert advice on complex and contentious cases and issues; directing the development and implementation of projects and initiatives of national scope; strategic direction and leadership in the development and implementation of national innovative operational organization and classification service delivery/improvement initiatives and solutions and undertakes related research including automation, best practices and emerging trends for application in PWGSC [Public Works and Government Services Canada]; managing resources allocated to the Division, including direct responsibility for collocated regional classification advisors; and functional responsibility for national classification operations.

Français

Domaine(s)
  • Postes gouvernementaux
  • Opérations de la gestion (Généralités)
OBS

gestionnaire, Services de classification régionaux et horizontaux : poste qui relève du directeur général, Opérations des ressources humaines, Travaux publics et Services gouvernementaux Canada.

Espagnol

Conserver la fiche 8

Fiche 9 2004-01-08

Anglais

Subject field(s)
  • Meetings
  • Paramedical Staff
  • Perinatal Period
OBS

EOAP on the Menu - Lunchtime sessions of the Employee and Organization Assistance Programme (EOAP).

OBS

Source: Manager, Employee and Organization Assistance Programme, Human Resources Branch, PWGSC [Public Works and Government Services Canada].

Terme(s)-clé(s)
  • Midwifery: Questions and Answers

Français

Domaine(s)
  • Réunions
  • Personnel para-médical
  • Périnatalité
OBS

PAEO AU MENU - Séances du midi du Programme d’aide aux employés et à l’organisation (PAEO).

OBS

Source :Gestionnaire, Programme d’aide aux employés et à l'organisation, Direction générale des ressources humaines, TPSGC [Travaux publics et Services gouvernementaux Canada].

Terme(s)-clé(s)
  • Exercice des sages-femmes : Questions et réponses
  • Exercice des sages-femmes

Espagnol

Conserver la fiche 9

Fiche 10 2003-03-04

Anglais

Subject field(s)
  • Government Contracts
  • Estimating (Construction)
CONT

During the design development stage, ... outline specifications are prepared. Thus, a more definite basis is provided for a more detailed cost estimate, which should also be prepared. The method used for preparing this cost estimate is similar to that employed in preparing the [preliminary] cost estimate during the schematic-design stage. It is based upon unit cost per square foot or metre, unit cost per cubic foot or metre, or cost per occupancy unit.

Français

Domaine(s)
  • Marchés publics
  • Évaluation et estimation (Construction)
CONT

En consultation avec le gestionnaire du projet désigné par le conseil de bande, préparer des instructions sur des questions techniques à l'intention des soumissionnaires; elles doivent comprendre une ventilation détaillée des quantités et des unités de mesure(lorsque cela est pertinent), une estimation détaillée des coûts et fixer la date du parachèvement des travaux prévus dans le marché.

OBS

L’estimation est obtenue en faisant le produit des nombres figurant à la colonne «quantités» par ceux figurant à la colonne «prix unitaires».

Espagnol

Conserver la fiche 10

Fiche 11 2002-01-29

Anglais

Subject field(s)
  • Occupation Names (General)
  • Execution of Work (Construction)
DEF

The person who manages the construction of a project.

OBS

The actual title given to the person performing this function, and his hierarchical position, depend on the size of the project and the organizational structure.

Français

Domaine(s)
  • Désignations des emplois (Généralités)
  • Exécution des travaux de construction
DEF

Personne qui gère la construction d’un projet.

DEF

Personne chargée de gérer la réalisation de la construction de bâtiment ou de génie civil.

OBS

La définition de «directeur de travaux» énoncée ci-dessus vise à clarifier le sens du terme et à déraciner l’usage fautif de «gérant de construction» dans le sens de directeur de travaux. À titre d’exemple, citons le cas de l’entreprise XYZ, gérant de construction, qui nomme L. Dirige au poste de directeur de travaux.

OBS

Le niveau hiérarchique et le titre de la personne remplissant cette fonction peuvent varier selon l'importance du projet ou la structure de l'entreprise. En effet, on trouve également dans les documents consultés :«responsable des travaux», «responsable de la construction», «gestionnaire des travaux», «administrateur des travaux, »etc.

Terme(s)-clé(s)
  • responsable des travaux
  • responsable de la construction
  • gestionnaire des travaux
  • administrateur des travaux

Espagnol

Campo(s) temático(s)
  • Nombramiento de cargos (Generalidades)
  • Ejecución de los trabajos de construcción
Conserver la fiche 11

Fiche 12 2001-01-15

Anglais

Subject field(s)
  • Various Proper Names
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

Français

Domaine(s)
  • Appellations diverses
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets-section 3. 3. 6-Avant-projet : L'objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires(ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et(ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Espagnol

Conserver la fiche 12

Fiche 13 2000-12-18

Anglais

Subject field(s)
  • Titles of Federal Government Programs (Canadian)
  • Sociology of persons with a disability
OBS

Canadian Rural Partnership, Pilot Projects 2000-2001. Yukon. Federal Partners: Public Works and Government Services Canada; Human Resources Development Canada. This project will improve the quality of life for people with physical and visual impairments living in the Yukon Territory. A local case manager will be hired to provide counselling and referral services, help clients access information and develop their knowledge of the Internet and other related technologies. The case manager will also provide community support and education regarding the needs and abilities of people with physical and visual impairments.

Français

Domaine(s)
  • Titres de programmes fédéraux (Gouvernement canadien)
  • Sociologie des personnes handicapées
OBS

Projets pilotes 2000-2001 du Partenariat rural canadien. Yukon, partenaires fédéraux :Travaux publics et Services gouvernementaux Canada; Développement des ressources humaines Canada. Ce projet permettra d’améliorer la qualité de vie des gens ayant des handicaps physique et visuel qui vivent sur le territoire du Yukon. On engagera un gestionnaire local de cas et celui-ci offrira des services d’orientation et de counselling, aidera les clients à avoir accès à de l'information ce qui leur permettra d’acquérir des connaissances sur Internet et sur les autres technologies connexes. Ce gestionnaire donnera également un appui communautaire et sensibilisera les gens à l'égard des besoins et des capacités des personnes qui ont une déficience visuelle ou physique.

Espagnol

Conserver la fiche 13

Fiche 14 2000-04-17

Anglais

Subject field(s)
  • Civil Engineering
  • Job Descriptions
OBS

MAP: Managing and Achieving Performance.

Terme(s)-clé(s)
  • lead for civil engineering managing and achieving performance

Français

Domaine(s)
  • Génie civil
  • Descriptions d'emplois
OBS

Il ne s’agit pas d’un titre de poste, mais plutôt de fonctions qui ont été confiées, dans le cadre de l'application de la méthode GAR [gérer et atteindre le rendement], à un gestionnaire de la vérification et de l'examen, Direction de l'examen des approvisionnements et des biens immobiliers, Directeur général de la vérification et de l'examen, TPSGC [Travaux publics et Services gouvernementaux].

Terme(s)-clé(s)
  • responsable de la méthode gérer et atteindre le rendement pour les activités de génie civil

Espagnol

Conserver la fiche 14

Fiche 15 2000-04-14

Anglais

Subject field(s)
  • Conference Titles
  • Training of Personnel
OBS

EOAP ON THE MENU - Lunchtime sessions of the Employee and Organization Assistance Programme (EOAP). COMING OUT OF YOUR SHELL Take time out to learn a few tricks about ways you can lead a less solitary life. Robert Dupras, Jr., M.Ed., will be our special guest at the next EOAP on the Menu, on Wednesday, April 19 [2000], in the Mezzanine of Tower A, Place du Portage, Phase III. Mr. Dupras will discuss the importance of knowing and loving yourself before you can love someone else; understanding your behavioural patterns in intimate relationships; how your emotions have an impact on your everyday life; developing self-respect; and determining who your ideal partner is.

OBS

Source(s): Manager, Employee and Organization Assistance Programme, Human Resources Branch, PWGSC [Public Works and Government Services Canada].

Français

Domaine(s)
  • Titres de conférences
  • Perfectionnement et formation du personnel
OBS

PAEO AU MENU Séances du midi du Programme d’aide aux employés et à l’organisation (PAEO). COMMENT SORTIR DE SA SOLITUDE Prenez quelques minutes pour apprendre quelques trucs sur les moyens disponibles pour sortir de sa solitude. C’est ce que vous propose Robert Dupras Jr. (M. Ed.), notre invité à la prochaine séance du PAEO au menu qui aura lieu le mercredi 19 avril [2000], à la mezzanine de la Tour A, Place du Portage, Phase III. M. Dupras discutera de l’importance qu’il y a de bien se connaître et de s’aimer avant de pouvoir aimer quelqu’un d’autre; des motifs qui vous animent dans vos relations interpersonnelles; de l’incidence de vos émotions dans votre vie de tous les jours; de développer le respect de soi-même et d’évaluer qui serait votre partenaire idéal.

OBS

Source(s) :Gestionnaire, Programme d’aide aux employés et à l'organisation, Direction générale des ressources humaines, TPSGC [Travaux publics et Services gouvernementaux Canada].

Espagnol

Conserver la fiche 15

Fiche 16 1999-07-05

Anglais

Subject field(s)
  • Federal Government Bodies and Committees (Canadian)
  • Ethics and Morals

Français

Domaine(s)
  • Organismes et comités fédéraux (Gouvernement canadien)
  • Éthique et Morale
OBS

À la Direction générale de la vérification et de l'examen de TPSGC [Travaux publics et Services gouvernementaux Canada]. Ce nouveau bureau comprend un directeur et une gestionnaire.

OBS

Bureau d’élaboration d’éthique : titre erroné figurant sur les cartes d’affaires.

OBS

Source(s) : Direction générale de la vérification et de l’examen, TPSGC.

Espagnol

Conserver la fiche 16

Fiche 17 1999-05-14

Anglais

Subject field(s)
  • Titles of Reports
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

Français

Domaine(s)
  • Titres de rapports
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets-section 3. 3. 6-Avant-projet : L'objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires(ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et(ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d’avancement du projet et d’attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Espagnol

Conserver la fiche 17

Fiche 18 1997-10-08

Anglais

Subject field(s)
  • Building Names

Français

Domaine(s)
  • Noms d'édifices et de bâtiments
OBS

Sis au pré Tunney, rue Holland, Ottawa; il semble s’agir d’un nom d’usage, car l'enseigne de Travaux publics Canada se lit comme suit : GOVERNMENT OF CANADA SUPPLY AND SERVICES FINANCE; GOUVERNEMENT DU CANADA APPROV. ET SERVICES FINANCIERS. Mais on l'appelle l'«immeuble des Finances». Consulté : M. Morin, gestionnaire de Travaux publics Canada chargé du district n° 5(Ottawa Ouest).

OBS

Sur une affiche, on écrit : «Immeuble des Finances».

OBS

Tunney’s Pasture - pré Tunney (Ottawa, Ontario) : Traduction directe et fidèle («pré» tout comme «pasture» rappelle les duels qui s’y déroulaient) que le Comité (Comité consultatif créé en 1976 par la Commission de la capitale nationale (CCN) pour étudier les toponymes en usage sur le territoire de la Capitale nationale) a jugée nécessaire étant donné l’existence de nombreux édifices gouvernementaux à cet endroit [Source : NCC-2, 1976]. C’est en raison de ceci que «Parc Tunney» a été remplacé par «pré Tunney» dans la première OBS de la présente fiche.

Espagnol

Conserver la fiche 18

Fiche 19 1997-10-08

Anglais

Subject field(s)
  • Building Names

Français

Domaine(s)
  • Noms d'édifices et de bâtiments
OBS

Sis au pré Tunney, rue Yarrow, Ottawa; le responsable de Travaux publics Canada n’ a pu trouver de texte d’enseigne dans ses dossiers; le nom semble donc être purement une question d’usage. Consulté : M. Morin, gestionnaire de Travaux publics Canada chargé du district n° 5(Ottawa Ouest).

OBS

Sur une affiche, on écrit : «Annexe de l’immeuble des Finances».

OBS

Tunney’s Pasture - pré Tunney (Ottawa, Ontario) : Traduction directe et fidèle («pré» tout comme «pasture» rappelle les duels qui s’y déroulaient) que le Comité (Comité consultatif créé en 1976 par la Commission de la capitale nationale (CCN) pour étudier les toponymes en usage sur le territoire de la Capitale nationale) a jugée nécessaire étant donné l’existence de nombreux édifices gouvernementaux à cet endroit [Source : NCC-2, 1976]. C’est en raison de ceci que «Parc Tunney» a été remplacé par «pré Tunney» dans la première OBS de la présente fiche.

Espagnol

Conserver la fiche 19

Fiche 20 1997-08-01

Anglais

Subject field(s)
  • Occupation Names (General)
  • Federal Administration

Français

Domaine(s)
  • Désignations des emplois (Généralités)
  • Administration fédérale
OBS

agent de soutien opérationnel : Titre officiel-Relève du gestionnaire des Processus opérationnels(Business Process Manager) à la Direction de la gestion du programme des approvisionnements de TPSGC [Travaux publics et Services gouvernementaux Canada].

OBS

Source(s) : Direction de la gestion du programme des approvisionnements de TPSGC.

Espagnol

Conserver la fiche 20

Fiche 21 1985-11-14

Anglais

Subject field(s)
  • Position Titles
  • Parks and Botanical Gardens

Français

Domaine(s)
  • Titres de postes
  • Parcs et jardins botaniques

Espagnol

Conserver la fiche 21

Fiche 22 1976-06-19

Anglais

Subject field(s)
  • Occupation Names (General)
  • Law of Contracts (common law)

Français

Domaine(s)
  • Désignations des emplois (Généralités)
  • Droit des contrats (common law)

Espagnol

Conserver la fiche 22

Fiche 23 1975-03-11

Anglais

Subject field(s)
  • Financial and Budgetary Management
  • Financial Accounting

Français

Domaine(s)
  • Gestion budgétaire et financière
  • Comptabilité générale
OBS

Dans l'exécution de grands projets de travaux, le gestionnaire débite les heures consacrées à l'entretien ou à la maintenance au «upkeep account».

Espagnol

Conserver la fiche 23

Avis de droit d’auteur pour la banque de données TERMIUM Plus®

© Services publics et Approvisionnement Canada, 2026
TERMIUM Plus®, la banque de données terminologiques et linguistiques du gouvernement du Canada
Un produit du Bureau de la traduction

En vedette

GCtraduction (accessible uniquement sur le réseau du gouvernement du Canada)

Utilisez ce prototype d’intelligence artificielle pour traduire le contenu du gouvernement du Canada jusqu’au niveau Protégé B inclusivement. Réservé au personnel de certains ministères et organismes.

Outils d'aide à la rédaction

Les outils d’aide à la rédaction du Portail linguistique ont fait peau neuve! Faciles à consulter, ils vous donnent accès à une foule de renseignements utiles pour mieux écrire en français et en anglais.

Lexiques et vocabulaires

Accédez aux lexiques et vocabulaires du Bureau de la traduction.

Date de modification :