TERMIUM Plus®

From: Translation Bureau

On social media

Consult the Government of Canada’s terminology data bank.

CRITICAL PATH METHOD [12 records]

Record 1 2026-01-08

English

Subject field(s)
  • Computer Mathematics
  • Computer Programs and Programming
  • Artificial Intelligence
  • Decision-Making Process
CONT

The introduced critical path algorithm allows for grouping linear activities into four categories regarding their critical status and their ability to influence project duration. The method is applied to a low‐pressure pipeline construction project and the results are presented.

French

Domaine(s)
  • Mathématiques informatiques
  • Programmes et programmation (Informatique)
  • Intelligence artificielle
  • Processus décisionnel

Spanish

Save record 1

Record 2 2017-11-30

English

Subject field(s)
  • Statistical Graphs and Diagrams
  • Management Operations (General)
DEF

A method of representing a series of associated activities in critical path scheduling or network analysis. Each activity is denoted by an arrow, as in the diagram.

French

Domaine(s)
  • Diagrammes et graphiques (Statistique)
  • Opérations de la gestion (Généralités)
DEF

Activité représentée sous la forme d'un cercle ou d'un nœud dans les graphiques utilisés dans la méthode du chemin critique ou de l'analyse de réseau.

Spanish

Save record 2

Record 3 2014-02-17

English

Subject field(s)
  • Organization Planning
DEF

In the critical path method, the earliest time that a scheduled activity may be finished.

French

Domaine(s)
  • Planification d'organisation
DEF

Dans le contexte de la méthode du chemin critique, date la plus précoce à laquelle une activité de l'échéancier peut être terminée.

Spanish

Save record 3

Record 4 2012-02-07

English

Subject field(s)
  • Organization Planning
DEF

In the critical path method, the earliest time that a schedule activity may be commenced.

CONT

Early dates are figured by a forward pass using a specific date and late dates are figured by using a backward starting from a completion date.

French

Domaine(s)
  • Planification d'organisation
DEF

Dans le contexte de la méthode du chemin critique, date la plus précoce à laquelle une activité de l'échéancier peut être commencée.

CONT

[...] Pour trouver [les relations entre les temps d'événement et d'activité,] il faut revenir au principe fondamental de calcul des dates au plus tôt des événements et des dates au plus tard des événements.

Spanish

Save record 4

Record 5 2011-12-28

English

Subject field(s)
  • Organization Planning
DEF

In the critical path method, the latest time that a schedule activity may be finished.

French

Domaine(s)
  • Planification d'organisation
DEF

Dans le contexte de la méthode du chemin critique, date la plus tardive à laquelle une activité de l'échéancier peut être terminée.

Spanish

Save record 5

Record 6 2011-12-28

English

Subject field(s)
  • Organization Planning
DEF

In the critical path method, the lastest time that a schedule activity may be commenced.

French

Domaine(s)
  • Planification d'organisation
DEF

Dans le contexte de la méthode du chemin critique, date la plus tardive à laquelle une activité de l'échéancier peut être commencée.

Spanish

Save record 6

Record 7 2010-03-12

English

Subject field(s)
  • Radio Waves
CONT

Since the ionosphere lying over the great circle determines the mode of propagation, a method for determining the MUF over that path suggests itself : we must first determine the critical frequency at the midpoint of the path at a particular layer height. Knowing the path length will enable us to determine what the MUF factor will be.

French

Domaine(s)
  • Ondes radioélectriques

Spanish

Campo(s) temático(s)
  • Ondas radioeléctricas
DEF

Relación entre la frecuencia máxima utilizable y la frecuencia crítica en el punto medio del salto.

OBS

símbolo: Md; en una transmisión de simple salto.

Save record 7

Record 8 2007-05-17

English

Subject field(s)
  • Organization Planning
DEF

In the critical path method, the earliestpossible pointin time on which the incompleted portions of an activity can finish, based on the network logic and any schedule constraints. Early finsig dates can change as the project progresses and changed and made to the project plan.

OBS

Term related to the critical path method.

French

Domaine(s)
  • Planification d'organisation

Spanish

Save record 8

Record 9 1995-12-11

English

Subject field(s)
  • Economic Planning
  • Financial and Budgetary Management
  • Organization Planning
DEF

A diagram that plots the sequence of activities for project planning and scheduling, shows which activities must be completed before others can commence, and indicates which activities cannot be delayed without delaying the whole project.

OBS

See "critical path method"(CPM), "program evaluation and review technique"(PERT).

French

Domaine(s)
  • Planification économique
  • Gestion budgétaire et financière
  • Planification d'organisation

Spanish

Campo(s) temático(s)
  • Planificación económica
  • Gestión presupuestaria y financiera
  • Planificación de organización
DEF

Este diagrama, que traza la secuencia de actividades de planificación y escalonamiento cronológico de un proyecto, muestra las actividades que deben completarse antes de que se puedan comenzar otras, e indica las que no se pueden demorar sin retrasar todo el proyecto.

Save record 9

Record 10 1980-09-11

English

Subject field(s)
  • Organization Planning
OBS

Term related to the critical path method.

French

Domaine(s)
  • Planification d'organisation

Spanish

Save record 10

Record 11 1980-09-05

English

Subject field(s)
  • Organization Planning
OBS

Term related to the critical path method.

French

Domaine(s)
  • Planification d'organisation
CONT

(...) Pour trouver [les relations entre les temps d'événement et d'activité,] il faut revenir au principe fondamental de calcul des dates au plus tôt des événements et des dates au plus tard des événements.

Spanish

Save record 11

Record 12 1975-03-11

English

Subject field(s)
  • Modern Mathematics
  • Operations Research and Management
OBS

D. that body of mathematics which abstracts a network into an array of nodes and branches. Examples :Critical Path Method.

French

Domaine(s)
  • Mathématiques modernes
  • Recherche et gestion opérationnelles

Spanish

Save record 12

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2026
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

GCtranslate (available on the Government of Canada network only)

Use this artificial intelligence prototype to translate Government of Canada content up to and including Protected B. Available to employees of selected departments and agencies only.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: