TERMIUM Plus®

The Government of Canada’s terminology and linguistic data bank.

B SCOPE [11 records]

Record 1 2024-07-22

English

Subject field(s)
  • Indigenous Peoples
CONT

The Review Panel will not make any conclusions or recommendations as to : a. the validity of Aboriginal or Treaty rights asserted by an Indigenous community or Nation or the strength of such claims; b. the scope of the Crown's duty to consult an Indigenous community or Nation...

OBS

Some Indigenous communities in Canada may choose to refer to themselves as "a Native community;" however, the use of this term by non-Indigenous people is seen as derogatory.

PHR

northern Indigenous community

French

Domaine(s)
  • Peuples Autochtones
CONT

La commission d'examen ne fera aucune conclusion ou recommandation : a. sur la validité des droits ancestraux et issus de traités établis par des communautés et nations autochtones ni sur la solidité de ces revendications; b. sur la portée de l'obligation légale de la Couronne de consulter une communauté ou une nation autochtone [...]

OBS

Malgré l'apparente synonymie des termes «communauté» et «collectivité», le terme «communauté» fait référence au groupe de personnes qui partagent les mêmes intérêts, objectifs, la même culture ou la même religion. Tandis que, «collectivité» fait référence au lieu où vivent un ensemble de personnes qui peuvent être soit des communautés ou bien un ensemble de personnes qui vivent sur un territoire donné : collectivité locale, nationale ou territoriale. Toutefois, en contexte, nous verrons que ces synonymes partiels peuvent être utilisés de manière interchangeable, et ce, dépendamment de l'éclairage sur lequel l'auteur voudra insister.

PHR

communauté autochtone nordique

Spanish

Campo(s) temático(s)
  • Pueblos indígenas
OBS

En el contexto canadiense, el término "indígena" incluye a las Primeras Naciones, a los inuits y a los métis.

Save record 1

Record 2 2017-02-13

English

Subject field(s)
  • Business and Administrative Documents
  • Investment
CONT

A report under subsection(1) shall be addressed to the Board and shall(a) include separate statements indicating whether, in the auditor's opinion,(i) the financial statements are presented fairly in accordance with generally accepted accounting principles applied on a basis consistent with that of the preceding year,(ii) the Board's transactions and those of its subsidiaries that have come to the auditor's notice in the course of the auditor's examination for the report were in accordance with this Act [Canada Pension Plan Investment Board Act] and the by-laws, and the by-laws of the subsidiaries, as the case may be, and(iii) the record of investments kept in accordance with paragraph 39(1)(c) fairly presents the information required by that paragraph; and(b) call attention to any other matter falling within the scope of the auditor's examination for the report that, in the auditor's opinion, should be brought to the attention of the Board.

Key term(s)
  • record of investment
  • investments record
  • investment record

French

Domaine(s)
  • Écrits commerciaux et administratifs
  • Investissements et placements
CONT

L'Office veille, en ce qui concerne tant lui-même que ses filiales : a) à faire tenir des documents comptables; b) à mettre en œuvre, en matière de finances et de gestion, des moyens de contrôle et d'information et à faire appliquer des méthodes de gestion; c) à faire tenir pour chaque exercice un registre des placements présentant : (i) la valeur comptable de chacun d'eux, (ii) leur valeur marchande et l'information permettant de la vérifier, (iii) les renseignements permettant de vérifier si les exigences de la présente loi [Loi sur l'Office d'investissement du régime de pensions du Canada] et les principes, normes et procédures en matière de placement ont été respectés.

Spanish

Save record 2

Record 3 2015-02-24

English

Subject field(s)
  • Titles of National Laws and Regulations (Non-Canadian)
OBS

In connexion with sub-paragraph(b) of paragraph 1 of Article 24 relating to certain matters within the scope of the National Health Service, the National Health Service(Amendment) Act, 1949, contains powers for charges to be made to persons not ordinarily resident in Great Britain(which category would include refugees) who receive treatment under the Service.

Key term(s)
  • National Health Service Amendment Act
  • National Health Service Amendment Act 1949

French

Domaine(s)
  • Titres de lois et de règlements nationaux non canadiens
OBS

En ce qui concerne l'alinéa b du paragraphe 1 de l'article 24 relatif à certaines questions qui relèvent de la compétence du Service national de la santé, la Loi de 1949 (amendement) sur le Service national de la santé, contient des dispositions qui permettent d'exiger le paiement des soins reçus au titre dudit service par des personnes qui ne résident pas ordinairement en Grande-Bretagne (catégorie dans laquelle entrent les réfugiés).

Key term(s)
  • Loi de 1949 sur le Service national de la santé

Spanish

Save record 3

Record 4 2014-01-24

English

Subject field(s)
  • Explosives and Pyrotechnical Materials (Industries)
  • Weapon Systems
DEF

Explosives that, by section 151 of the Explosives Regulations, are deemed to be under the direction or control of the Minister of National Defence. (Section 150 of the Explosives Regulations)

OBS

Section 151 provides that explosives are deemed to be under the direction or control of the Minister while they are :(a) in or on any area or structure under the control of the Minister or in or on any area or structure at his direction;(b) being used by the Canadian Forces, the Defence Research Board or any other branch or service of the Department for military purposes;(c) in or on a departmental vehicle or a vehicle that, on behalf of the Department is operated by, or in the custody of an officer or man or civilian employee of the Department;(d) in or on any vehicle under the supervision of an officer or man or civilian employee of the Department acting within the scope of his duties or employment; or(e) under the direction and control of the armed forces cooperating with the Canadian Forces.

OBS

defence explosives: term and definition officially approved by the Defence Terminology Standardization Board.

Key term(s)
  • defense explosives

French

Domaine(s)
  • Explosifs et artifices (Industries)
  • Systèmes d'armes
DEF

Explosifs qui, de par l'article 151 du Règlement sur les explosifs, sont censés être placés sous la direction ou le contrôle du ministre de la Défense nationale. (Article 150 du Règlement sur les explosifs)

OBS

L'article 151 prévoit que les explosifs sont censés être placés sous la direction ou le contrôle du ministre quand ils sont : a) dans ou sur toute zone ou tout bâtiment soumis à ses ordres; b) en train d'être employés à des fins militaires par les Forces canadiennes, le Conseil de recherches pour la défense, ou toute autre division ou tout autre service du ministère; c) dans ou sur un véhicule du ministère ou un véhicule qui, dans l'intérêt du ministère, est conduit par un officier, un soldat ou un employé civil du ministère, ou commis à leur garde; d) dans ou sur tout véhicule placé sous la surveillance d'un officier ou d'un soldat ou d'un employé civil du ministère qui ne fait que remplir ses fonctions ou son emploi; ou e) sous la direction et le contrôle des forces armées collaborant avec les Forces canadiennes.

OBS

explosifs de défense : terme et définition uniformisés par le Conseil de normalisation de terminologie de la Défense.

Spanish

Save record 4

Record 5 2002-03-05

English

Subject field(s)
  • Optical Instruments
  • Optics
  • Scientific Instruments
CONT

What is the component need to check the focal range of the eyepiece assembly? a. collimation bridge; b. [good answer :] diopter scope; c. detector probe.

CONT

Collimation and Diopter Scope - Binocular alignment of the NVD is performed with the Collimation Bridge. Eye Piece diopter range can be verified with the calibrated, full range Diopter Scope. (Optional). ... Diopter Scope: Graduated -6 to +2 diopter scale.

CONT

The focus adjustment range or Diopter Adjustment Range of the weapon sight eyepiece is checked using the optional diopter scope and an adapter that is specific to the weapon sight eyepiece configuration. The diopter scope, ANV-126-040, is calibrated in whole diopter steps from +2 to -6 diopters, and is accurately calibrated at zero diopters. The eyepiece adapter is used in common with the gain test probe.

French

Domaine(s)
  • Instruments d'optique
  • Optique
  • Instruments scientifiques

Spanish

Save record 5

Record 6 2002-03-05

English

Subject field(s)
  • Optical Instruments
  • Optics
  • Scientific Instruments
CONT

What is the component needed to check the focal range of the eyepiece assembly? a. collimation bridge; b. [good answer :] diopter scope; c. detector probe.

CONT

Collimation and Diopter Scope - Binocular alignment of the NVD is performed with the Collimation Bridge. Eye Piece diopter range can be verified with the calibrated, full range Diopter Scope. (Optional). ... Collimation Bridge: Contains two beam combining prisms in rugged bridge for evaluation of goggle optical alignment. Allows left-to-right, right-to-left checking.

CONT

Test set infrared viewer ... Matl: Main light source and console, gain probe, battery case, ac power cord, AN/AVS-6 adapter, diopter, collimation bridge, manual. Func: This portable NVG test instrument is used for evaluating performance of most goggles, it tests goggles and weapon sights.

OBS

collimation: the process by which a divergent beam of energy is converted into a parallel beam. [in French:] "collimation."

French

Domaine(s)
  • Instruments d'optique
  • Optique
  • Instruments scientifiques
CONT

Radiothérapie de haute énergie. Dans ces unités de traitement, l'élément radioactif est confiné dans une capsule cylindrique scellée (diamètre : 2 cm), placée au centre d'un container de protection (plomb), muni d'un obturateur et d'un dispositif de collimation du faisceau.

Spanish

Save record 6

Record 7 2001-07-25

English

Subject field(s)
  • Real Estate
CONT

The scope and content of the BPR [Building Performance Review] will be required to include the following : a) building background; b) health and safety compliance; c) maintenance analysis; d) energy management; e) environmental management; f) physical condition; g) compliance with special government programs; h) summary of actions required; and i) conclusions and recommendations.

French

Domaine(s)
  • Immobilier
CONT

L'ERI [Évaluation du rendement de l'immeuble], qui sera la principale source d'information pour l'élaboration du PGI [Plan de gestion des immeubles], devra notamment porter sur ce qui suit : a. historique de l'immeuble; b. conformité aux normes relatives à la santé et à la sécurité; c. analyse de l'entretien; d. gestion de l'énergie; e. gestion de l'environnement; f. état des lieux; g. conformité aux programmes spéciaux du gouvernement [...]

Spanish

Save record 7

Record 8 2001-02-02

English

Subject field(s)
  • Artificial Intelligence
  • Computer Programs and Programming
CONT

The POSIX OSE brings together many different standards necessary to address the scope of an entire information processing systems.... The reference model categorizes standards as two types of interfaces : a) Application Programming Interface(API) Standards.... b) External Environment Interface(EEI) Standards....

OBS

The term(s) and supporting text have been taken from a document presented as a working draft of the Technical Report on Multimedia and Hypermedia: Model and Framework.

French

Domaine(s)
  • Intelligence artificielle
  • Programmes et programmation (Informatique)
OBS

POSIX.

OBS

Environnement à systèmes ouverts.

Spanish

Save record 8

Record 9 2001-01-15

English

Subject field(s)
  • Various Proper Names
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant’s Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant’s design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant’s design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

French

Domaine(s)
  • Appellations diverses
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L'objectif de cette sous-phase consiste à s'assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d'autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s'assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d'améliorer la clarté des dessins et (ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d'un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d'avancement du projet et d'attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d'investissement ou de réalisation d'un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Spanish

Save record 9

Record 10 1999-05-14

English

Subject field(s)
  • Titles of Reports
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant’s Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant’s design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant’s design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

French

Domaine(s)
  • Titres de rapports
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets - section 3.3.6 - Avant-projet : L'objectif de cette sous-phase consiste à s'assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires (ce qui oblige souvent à tenir des réunions avec le client ou d'autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s'assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d'améliorer la clarté des dessins et (ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l'estimation du type B. Lorsqu'on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d'un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l'ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l'état d'avancement du projet et d'attirer l'attention sur les changements apportés aux délais, aux coûts, à la qualité et à l'étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d'investissement ou de réalisation d'un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l'équipe des SI chargée de l'examen de la conception et l'équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Spanish

Save record 10

Record 11 1995-03-01

English

Subject field(s)
  • Radar, Radio Guidance and Goniometry

French

Domaine(s)
  • Radar, radioguidage et radiogoniométrie

Spanish

Save record 11

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2025
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

Language Portal of Canada

Access a collection of Canadian resources on all aspects of English and French, including quizzes.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: