TERMIUM Plus®

The Government of Canada’s terminology and linguistic data bank.

OPERATIONAL FEASIBILITY [9 records]

Record 1 2023-12-21

English

Subject field(s)
  • Radiotelephony
  • Air Transport
CONT

... much of the [aviation English] training should focus on acquiring proficiency in the essential operational functions of radiotelephony : orders; requests; offers to act; advice; undertakings; sharing information about past, present and future; expressing necessity, feasibility and capacity, etc.... In routine situations, the information in the functions mentioned above can be largely and most properly transmitted using standard phraseology. However, in non-routine, unusual or abnormal situations, there will be a need for plain language to clarify, paraphrase or provide additional information, for example, to describe a system failure, a passenger's state of health or an obstacle on the runway.

French

Domaine(s)
  • Radiotéléphonie
  • Transport aérien
CONT

[...] une grande partie de la formation [en anglais aéronautique] doit mettre l'accent sur l'aisance à réaliser les fonctions radiotéléphoniques essentielles : ordre; demande d'information; proposition d'action; avis; engagement; partage d'information sur le passé, le présent et le futur; expression de la nécessité, de la faisabilité et de la capacité, etc. [...] En temps normal, l'information échangée dans le cadre des fonctions mentionnées ci-dessus peut être transmise dans une grande mesure et le plus efficacement au moyen des expressions conventionnelles. Cependant, dans les situations inhabituelles, inusitées ou anormales, il faut recourir au langage clair pour préciser, paraphraser ou compléter l'information, par exemple pour décrire une panne de système, l'état de santé d'un passager ou un obstacle sur la piste.

Spanish

Save record 1

Record 2 - external organization data 2016-04-18

English

Subject field(s)
  • Compartment - Royal Canadian Mounted Police (RCMP)
Universal entry(ies)
004496
occupation code, see observation
OBS

004496: Royal Canadian Mounted Police job code.

OBS

The member is responsible for : developing low-level electronic circuit analysis techniques; performing incoming exhibit identification, decontamination, evaluation, assessment and triage; processing operational case files using existing solutions which includes handling exhibits, performing low-level digital forensic analysis of exhibits and writing detailed forensic analysis reports for court and/or criminal investigation purposes; assessing incoming exhibits for technical feasibility and performing technical evaluations of third party products and technologies; and giving evidence in court.

Key term(s)
  • Forensic Hard Ware Technician

French

Domaine(s)
  • Tiroir - Gendarmerie royale du Canada (GRC)
Entrée(s) universelle(s)
004496
occupation code, see observation
OBS

004496 : code d'emploi de la Gendarmerie royale du Canada.

OBS

Le membre remplit les fonctions suivantes : mettre au point des techniques d'analyse élémentaire des circuits électroniques; identifier, décontaminer, évaluer et trier les pièces à conviction reçues; régler des dossiers opérationnels en appliquant les solutions existantes, notamment manipuler des pièces à conviction, procéder à l'analyse judiciaire numérique élémentaire de pièces à conviction et rédiger des rapports d'analyse judiciaire détaillés à des fins judiciaires ou d'enquête criminelle; évaluer les pièces à conviction reçues pour en déterminer la faisabilité technique et effectuer des évaluations techniques de produits et de technologies tiers; témoigner devant les tribunaux.

Key term(s)
  • matériel judiciaire - technicien
  • matériel judiciaire - technicienne

Spanish

Save record 2

Record 3 2005-04-19

English

Subject field(s)
  • Symposium Titles
  • Mathematical Geography
OBS

This workshop will expose participants to proven operational models for planning and managing geomatics techology transfer activities. Such activities have as their goals the sustainable transfer of geomatics data, products, tools and capabilities to international clients. The models are based on three principles of risk management : technical feasibility, practical availability and sustainability. The workshop provides both supplier-based and recipient-based perceptions of the technology transfer process. The presentation-based half-day program includes an extensive workshop manual and will be illustrated with real world examples drawn from the authors’ extensive international technology transfer experience. International Symposium "Geomatics in the Era of RADARSAT", Ottawa, 1997.

French

Domaine(s)
  • Titres de symposiums
  • Géographie mathématique
OBS

Cet atelier exposera les participants à des modèles opérationnels éprouvés pour la planification et la gestion d'activités liées au transfert de technologies en géomatique. Ces activités ont pour objectif le transfert durable de données, de produits, d'outils et de compétences à des clients étrangers. Les modèles reposent sur trois principes de gestion du risque : la faisabilité technique, la disponibilité et la durabilité. L'atelier présentera les perspectives du fournisseur et du bénéficiaire dans le processus de transfert de technologies. Un manuel détaillé accompagne le programme d'une demi journée basé sur des exposés. Les auteurs donneront en outre des exemples concrets tirés de leur vaste expérience internationale dans le domaine du transfert de technologies. Symposium international «La géomatique à l'ère de RADARSAT» qui eut lieu à Ottawa en 1997.

Spanish

Save record 3

Record 4 2003-06-10

English

Subject field(s)
  • System Names
  • Hydrology and Hydrography
  • Climate Change
OBS

In 1990 a research project was funded by the Commission of the European Communities, within the frame of the funding programme EPOCH with the aim of evaluating the possibility of such integration. The project, which title was "A Comprehensive Forecasting System for Flood Risk Mitigation and Control"(AFORISM)(Todini, 1995c) aimed at verifying different approaches in rainfall modelling as well as in rainfall-runoff modelling and their integration in a decision support system both for planning and for real time flood forecasting and management. In order to do so a feasibility study, based upon the Reno river, aiming at integrating all the innovative technologies in an operational decision support tool for flood forecasting and flood impact analysis was carried out by the following research groups.

French

Domaine(s)
  • Noms de systèmes
  • Hydrologie et hydrographie
  • Changements climatiques
Key term(s)
  • Système global de prévision pour l'atténuation des risques liés aux crues

Spanish

Campo(s) temático(s)
  • Nombres de sistemas
  • Hidrología e hidrografía
  • Cambio climático
Save record 4

Record 5 2000-08-10

English

Subject field(s)
  • Waste Management
CONT

Information required to select a disposal site shall include(a) physical, chemical and biological characteristics of the water-column and the sea-bed;(b) location of amenities, values and other uses of the sea in the area under consideration;(c) assessment of the constituent fluxes associated with disposal in relation to existing fluxes of substances in the marine environment; and(d) economic and operational feasibility.

OBS

Statute cited: Canadian Environmental Protection Act.

French

Domaine(s)
  • Gestion des déchets
CONT

Les renseignements requis pour choisir un lieu d'immersion doivent inclure : a) les caractéristiques physiques, chimiques et biologiques de la colonne d'eau et des fonds marins; b) l'emplacement des agréments, valeurs et autres utilisations de la mer dans la zone considérée; c) l'évaluation des flux de constituants liés à l'immersion par rapport aux flux de substances préexistants dans le milieu marin; d) la viabilité économique et opérationnelle.

OBS

Loi citée : Loi canadienne sur la protection de l'environnement.

Spanish

Save record 5

Record 6 2000-08-10

English

Subject field(s)
  • Waste Management
CONT

Information required to select a disposal site shall include(a) physical, chemical and biological characteristics of the water-column and the sea-bed;(b) location of amenities, values and other uses of the sea in the area under consideration;(c) assessment of the constituent fluxes associated with disposal in relation to existing fluxes of substances in the marine environment; and(d) economic and operational feasibility.

OBS

Statute cited: Canadian Environmental Protection Act.

French

Domaine(s)
  • Gestion des déchets
CONT

Les renseignements requis pour choisir un lieu d'immersion doivent inclure : a) les caractéristiques physiques, chimiques et biologiques de la colonne d'eau et des fonds marins; b) l'emplacement des agréments, valeurs et autres utilisations de la mer dans la zone considérée; c) l'évaluation des flux de constituants liés à l'immersion par rapport aux flux de substances préexistants dans le milieu marin; d) la viabilité économique et opérationnelle.

OBS

Loi citée : Loi canadienne sur la protection de l'environnement.

Spanish

Save record 6

Record 7 1997-09-17

English

Subject field(s)
  • Engineering
  • Industrial Design
  • Production Management
CONT

... there is never a simple relation between service performance and material properties. ... Increasing attention is being given to design aspects that extend beyond the production stage.

OBS

In 1979 TDC supported Voyageur Inc. in a technical, operational and economic assessment of the feasibility of using articulated buses in Canada.

OBS

See also the record for "user-related performance".

French

Domaine(s)
  • Ingénierie
  • Dessin industriel
  • Gestion de la production
CONT

Les spécifications du produit sont les performances que devra avoir le produit tout au long de sa vie. Elles comportent donc inévitablement les trois aspects économiques, d'usage, techniques entre lesquels il doit y avoir cohérence.

OBS

Comparer «performance d'usage» et «performance usuelle».

Spanish

Save record 7

Record 8 1997-05-26

English

Subject field(s)
  • Government Accounting
DEF

The initial phase of the project life cycle during which the sponsoring department establishes operational needs, produces the statement of operational requirements, conducts initial options analyses and feasibility studies, sets up appropriate management framwork and agreements, assigns resources and makes an initial assessment of projet risk.

French

Domaine(s)
  • Comptabilité publique
DEF

Phase initiale du cycle de vie du projet, durant laquelle le ministère parrain détermine les besoins opérationnels, effectue les premières analyses des options et les études de faisabilité, met sur pied le cadre de gestion approprié, conclut les ententes pertinentes, affecte les ressources et prépare une première évaluation des risques associés au projet.

Spanish

Save record 8

Record 9 1996-05-15

English

Subject field(s)
  • Management Control

French

Domaine(s)
  • Contrôle de gestion

Spanish

Save record 9

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2025
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

Language Portal of Canada

Access a collection of Canadian resources on all aspects of English and French, including quizzes.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: