TERMIUM Plus®

The Government of Canada’s terminology and linguistic data bank.

BUILDING BLOCK METHOD [1 record]

Record 1 2004-05-20

English

Subject field(s)
  • Petroleum Asphalts
CONT

The EUB [Alberta Energy and Utilities Board] originally calculated the in-place volume of crude bitumen using a volumetric methodology called the Building Block Method. On a quarter section basis, over the entire deposit and for each horizon containing bitumen, a volume was determine where the minimum cut-offs were exceeded ... The data for each quarter section was taken from drill holes, or inferred from the lowest value of surrounding lands.

French

Domaine(s)
  • Bitumes
CONT

À l'origine, l'Energy and Utilities Board de l'Alberta (EUB) calculait le volume en place de bitume naturel à l'aide d'une méthode volumétrique appelée «méthode des blocs». En procédant par quart de section, on déterminait, pour chaque horizon renfermant du bitume, le volume des ressources qui dépassaient certaines limites convenues, et ce pour l'ensemble du dépôt. [...] Pour obtenir les données relatives à un quart de section, soit on forait des trous de sonde, soit on appliquait les valeurs les plus faibles établies pour les terrains adjacents.

Spanish

Save record 1

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2024
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

Language Portal of Canada

Access a collection of Canadian resources on all aspects of English and French, including quizzes.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: