TERMIUM Plus®

The Government of Canada’s terminology and linguistic data bank.

EXPERT-CONSEIL CONCEPTION [5 records]

Record 1 2007-05-18

English

Subject field(s)
  • Occupation Names (General)
  • Office-Work Organization
OBS

[An organization design consultant] advises management on work systems design and the efficient use of human resources. Outputs include intervention strategies, alternatives work designs, and implementation.

French

Domaine(s)
  • Désignations des emplois (Généralités)
  • Organisation du travail de bureau

Spanish

Save record 1

Record 2 2003-03-11

English

Subject field(s)
  • Occupation Names (General)
  • Architectural Design
  • Environmental Management
CONT

Such procedures must be discussed with the property and facility managers, the project manager, and design consultants, inspectors, construction contractors, major installation trades and service suppliers, as well as the occupant representatives.

French

Domaine(s)
  • Désignations des emplois (Généralités)
  • Conception architecturale
  • Gestion environnementale
CONT

Il faut discuter de ces moyens avec les gestionnaires de la propriété et de l’installation, le gestionnaire du projet, les consultants en conception, les inspecteurs, les entrepreneurs en construction, les représentants des principaux corps de métier et les fournisseurs de services, de même que les représentants des occupants.

Spanish

Save record 2

Record 3 2001-01-15

English

Subject field(s)
  • Various Proper Names
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

French

Domaine(s)
  • Appellations diverses
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets-section 3. 3. 6-Avant-projet : L'objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires(ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et(ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l’estimation du type B. Lorsqu’on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l’ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l’état d’avancement du projet et d’attirer l’attention sur les changements apportés aux délais, aux coûts, à la qualité et à l’étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l’équipe des SI chargée de l’examen de la conception et l’équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Spanish

Save record 3

Record 4 1999-05-14

English

Subject field(s)
  • Titles of Reports
  • Management Operations (General)
OBS

Project Management Practice Standard - Section 3.3.6 - Design Development: The objective of this sub-phase is to ensure that the consultant's Preliminary Design and Report meets both client and regulatory requirements, and is completed to high quality standards. The Project Manager facilitates the consultant's design efforts by responding to requests for more information (which often involves meeting with the client or other RPS personnel). While there may be direct discussions between the designers and the client/owner, the Project Manager must carefully manage these communications to ensure that the client can fully understand and analyze the proposals which the consultant is offering, and that RPS and client views are expressed to the consultant in appropriately detailed, technical terms. The Project Manager, together with the RPS team, also reviews the consultant's design at progressive stages of development, and may pose questions regarding design standards chosen or make suggestions on how to improve the clarity of the drawings and/or specifications.

OBS

The Preliminary Design Report provides more detailed information about the materials and standards to be employed during construction, hence a more detailed Class B cost estimate can be prepared. Once the Preliminary Design Report is complete, the Project Manager participates in a presentation to the client at which the designer demonstrates how his preliminary work has addressed the client's functional and aesthetic needs. Throughout this process, the Project Manager reports regularly to RPS and client management to confirm the project status and to identify those changes in time, cost, quality and scope which may alter the investment or program strategies. This sub-phase is completed when the Preliminary Design Report has been accepted and signed off by the client, by all applicable regulatory and design authorities, by the RPS Design Review team, and by the RPS Project Team.

French

Domaine(s)
  • Titres de rapports
  • Opérations de la gestion (Généralités)
OBS

Pratique courante de la gestion de projets-section 3. 3. 6-Avant-projet : L'objectif de cette sous-phase consiste à s’assurer que la conception préliminaire et le rapport de l'expert-conseil respectent les exigences du client et la réglementation, ainsi que des normes de qualité élevée. Le gestionnaire de projet facilite les efforts de conception de l'expert-conseil en donnant suite à ses demandes de renseignements supplémentaires(ce qui oblige souvent à tenir des réunions avec le client ou d’autres employés des SI). Bien que les concepteurs et le client ou le propriétaire puissent parfois discuter directement, le gestionnaire de projet doit encadrer attentivement ces échanges, afin de s’assurer que le client pourra comprendre et analyser parfaitement les propositions de l'expert-conseil et qu'on fera connaître l'avis des SI et du client à l'expert-conseil en faisant appel à des termes techniques suffisamment précis. En collaboration avec l'équipe représentant les SI, le gestionnaire de projet revoit en outre les travaux de conception de l'expert-conseil à différentes étapes de leur élaboration et peut poser des questions sur les normes de conception ou faire des suggestions sur la manière d’améliorer la clarté des dessins et(ou) des devis.

OBS

Le Rapport de conception préliminaire renferme des renseignements plus détaillés sur les matériaux à utiliser et les normes à respecter pendant les travaux de construction; on peut donc préparer une estimation des coûts plus détaillée, soit l’estimation du type B. Lorsqu’on a établi le Rapport de conception préliminaire, le gestionnaire de projet participe à la présentation, au client, d’un exposé [sic] au cours duquel le responsable de la conception démontre que ses travaux préliminaires répondent aux besoins fonctionnels et esthétiques du client. Dans l’ensemble de ce processus, le gestionnaire de projet présente à intervalles réguliers des rapports aux SI et à la direction du client afin de confirmer l’état d’avancement du projet et d’attirer l’attention sur les changements apportés aux délais, aux coûts, à la qualité et à l’étendue des travaux et qui pourraient avoir pour effet de modifier les stratégies en matière d’investissement ou de réalisation d’un programme. Cette sous-phase prend fin lorsque le client, tous les responsables compétents de la réglementation et de la conception, l’équipe des SI chargée de l’examen de la conception et l’équipe du projet des SI ont accepté et approuvé le Rapport de conception préliminaire.

Spanish

Save record 4

Record 5 1999-05-14

English

Subject field(s)
  • Titles of Reports
  • Business and Administrative Documents
OBS

Project Management Practice Standard - Section 3.3.5 - Concept Design: in some instances, where projects are small or consist of engineered works (where preliminary studies have already been done), this sub-phase may be combined with 3.3.6 Design Development. However, where the project is large, complex or unique the Project Team may decide that it is more efficient and economical to discuss the merits of various design options, while the design is still in conceptual form. In the latter case, the objective of this sub-phase is to conceptually define the design concept and the class C cost estimate, and then to gain client and RPS approval prior to instructing the designers to develop a more refined design. Although the consultant and client may communicate directly, the Project Manager must manage the communication flow to control project commitments and to ensure that there is full understanding by both parties. This involves helping the client to analyze and to evaluate the consultant's enquiries, and then responding to the consultant in technical terms which satisfy specific design conditions. Once the consultant has fulfilled the requirement for submissions as specified in the Project Brief, and the client, the project team, the regulatory authorities and the RPS design authorities have accepted the final concept, the Project Manager ensures adequate documentation of these positions in a Conceptual Design Report. This report is formally signed off by all Project Team members. Thus, this sub-phase is completed when the Project Manager is convinced that the consultant has adequately addressed the needs of the client/owner within acceptable time, cost and quality parameters. Only then will the Project Manager allow the consultant to refine the concept in the Design Development phase.

French

Domaine(s)
  • Titres de rapports
  • Écrits commerciaux et administratifs
OBS

Pratique courante de la gestion de projets-section-3. 3. 5 Conception : Dans certains cas, lorsque les projets sont relativement peu importants et prévoient des ouvrages de génie(et que les premières études sont déjà faites), on peut regrouper cette sous-phase et la sous-phase 3. 3. 6(Avant-projet). Toutefois, lorsqu'il s’agit d’un projet important, complexe ou exceptionnel, l'équipe chargée du projet peut décider qu'il sera plus efficace et plus économique de discuter du bien-fondé de diverses options de conception à l'étape de l'avant-projet. Dans ce dernier cas, l'objectif de cette sous-phase consiste à définir théoriquement le concept du design et à établir l'estimation des coûts du type C, puis à demander l'approbation du client et des SI avant de donner pour consigne aux responsables de la conception d’élaborer un projet plus complet. Bien que l'expert-conseil et le client puissent communiquer directement entre eux, le gestionnaire de projet doit encadrer les échanges afin de contrôler les engagements financiers consacrés au projet et de veiller à ce que les deux parties soient parfaitement au courant des exigences à respecter. Il s’agit notamment d’aider le client à analyser et à évaluer les demandes de renseignements de l'expert-conseil, puis à y donner suite en faisant appel à des termes techniques qui respectent les conditions particulières de la conception. Lorsque l'expert-conseil a déposé les documents nécessaires conformément aux exigences précisées dans l'Énoncé de projet et que le client, l'équipe chargée du projet, les responsables de la réglementation ainsi que les responsables de la conception des SI ont accepté la conception finale, le gestionnaire de projet veille à consigner comme il se doit cette acceptation dans un Rapport de définition du concept. Tous les membres de l'équipe chargée du projet approuvent officiellement ce rapport. Par conséquent, cette sous-phase prend fin lorsque le gestionnaire de projet est convaincu

Spanish

Save record 5

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2025
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

Language Portal of Canada

Access a collection of Canadian resources on all aspects of English and French, including quizzes.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: