TERMIUM Plus®

The Government of Canada’s terminology and linguistic data bank.

MISE PLACE REMORQUAGE [1 record]

Record 1 2000-12-21

English

Subject field(s)
  • Tunnels, Overpasses and Bridges
CONT

The method of construction used depends largely on the type of bridge being built. There are six construction methods: falsework, flotation, cantilevering, sliding, direct lifting, and suspension ... In the flotation method, mainly used in building long bridges, large bridge sections are prefabricated on shore and floated out on barges to the bridge site. The sections are then hoisted into place either by floating derricks or by winches placed on previously constructed sections of the bridge.

French

Domaine(s)
  • Tunnels, viaducs et ponts
OBS

Les éléments sont préfabriqués à chaque entrée du tunnel, puis conduits par barge et immergés pour accouplement. En même temps, un pont est construit sur le tunnel pour recevoir la voie férrée.

Spanish

Save record 1

Copyright notice for the TERMIUM Plus® data bank

© Public Services and Procurement Canada, 2024
TERMIUM Plus®, the Government of Canada's terminology and linguistic data bank
A product of the Translation Bureau

Features

Language Portal of Canada

Access a collection of Canadian resources on all aspects of English and French, including quizzes.

Writing tools

The Language Portal’s writing tools have a new look! Easy to consult, they give you access to a wealth of information that will help you write better in English and French.

Glossaries and vocabularies

Access Translation Bureau glossaries and vocabularies.

Date Modified: